Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order

Draft amendments of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Second Amendment) Regulations, 2022.

OrderDated 14 Sep 2022

Read with the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's order of 14 September 2022 closing out the consultation on the draft Second Amendment to its Rooftop Solar PV Grid Interactive System (Net Metering) Regulations, 2015 (p1). Pages 1–2 set out the procedural history: the 2015 parent regulations, the first amendment of 2018, the draft second amendment published in the Rajpatra on 07.07.2022, newspaper notices of 13 July 2022 with a 10 August 2022 comment deadline, and a public hearing held in Shimla on 22 August 2022. Only HIMURJA filed suggestions (p2).

The order then gives the Commission's reasoning on each point raised. It declines HIMURJA's request to raise the net-metering ceiling and keeps the 50 kWp cap, directing larger installations (above 50 kWp up to 1.00 MWp) to net billing instead (p2–3). It finds HPSEBL's concern about a 30-day billing-software change window already met by an existing 60-day proviso in Regulation 4(C) (p3). Taking account of MNRE's draft SOP on Virtual and Group Net Metering circulated on 04.08.2022, it directs three drafting changes — a "once in the financial year" limit in Regulation 4(c), "first come first serve" allocation in Regulation 7(3), and a new distribution licensee inspection right over rooftop systems in Regulation 8 (p3–4).

The order closes by deciding to finalise the amendment regulations with need-based minor modifications of a general nature (p4), signed by all three members. Annexure A lists the four participants at the public hearing (p5). The amended regulation text itself is not reproduced.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Technical standards

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document