HPERC · Himachal Pradesh Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft
Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Third Amendment) Regulations, 2024
Draft amendmentDated 13 May 2024No. HPERC-H(1)-11/2015 dated 13th May, 2024
Draft
A proposal that has since been finalised as the Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's notification of 13 May 2024 (No. HPERC-H(1)-11/2015) publishes, for objections and suggestions, a draft Third Amendment to the Commission's rooftop solar regulations (p1). The draft is a response to the Ministry of Power's notification of 22 February 2024 amending the Electricity (Right to Consumers) Rules, 2020 to exempt rooftop solar systems up to 10 kW from the technical feasibility study; the Commission states this makes amendment of its own Grid Interactive Rooftop Regulations necessary (p1).
The package is short. Clause 1 gives the short title and provides that the amendment comes into force from the date of publication in the Rajpatra, Himachal Pradesh (p2). Clause 2 adds a definition of 'State Nodal Agency' to Regulation 2 — HIMURJA or the HPSEB Limited distribution licensee designated by the State or Central Government to implement rooftop solar schemes (p2). Clause 3 rewrites parts of Regulation 7: the sub-regulation dealing with eligible consumers availing financial assistance (p2); the registration and approval sub-regulation, which routes registration through the State Nodal Agency in online mode or otherwise, requires acknowledgement and in-principle approval within the timelines in Table-4, and extends those timelines to the Chief Electrical Inspector or other competent authority (p2–3); the Table-3 activity row, which becomes 'Technical Feasibility above 10 kW capacity' (p3); and a new Note 3 below Table 3, under which applications up to 10 kW complete in all respects are deemed accepted without technical feasibility, and for systems above 10 kW the feasibility study must be completed within fifteen days, failing which the proposal is presumed technically feasible (p3). A proviso makes any shorter timelines in the Electricity (Right of Consumers) Rules, as amended from time to time, prevail over Tables 3 and 4 (p3).
Objections and suggestions are to be addressed to the Secretary, HPERC, Shimla, by 31 May 2024 (p1–2).
Read with this
The regulation
Amendments and corrections
- Dated 6 Nov 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022
- Dated 12 Jun 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026
Commencement notices and reasons
- Dated 31 Jul 2015Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order
- Dated 6 Nov 2018Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 8 Oct 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft
- Dated 11 Mar 2019Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft
- Dated 5 Jul 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022 — Draft
- Dated 14 Jul 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.