Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft

Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Third Amendment) Regulations, 2024

Draft amendmentDated 13 May 2024No. HPERC-H(1)-11/2015 dated 13th May, 2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's notification of 13 May 2024 (No. HPERC-H(1)-11/2015) publishes, for objections and suggestions, a draft Third Amendment to the Commission's rooftop solar regulations (p1). The draft is a response to the Ministry of Power's notification of 22 February 2024 amending the Electricity (Right to Consumers) Rules, 2020 to exempt rooftop solar systems up to 10 kW from the technical feasibility study; the Commission states this makes amendment of its own Grid Interactive Rooftop Regulations necessary (p1).

The package is short. Clause 1 gives the short title and provides that the amendment comes into force from the date of publication in the Rajpatra, Himachal Pradesh (p2). Clause 2 adds a definition of 'State Nodal Agency' to Regulation 2 — HIMURJA or the HPSEB Limited distribution licensee designated by the State or Central Government to implement rooftop solar schemes (p2). Clause 3 rewrites parts of Regulation 7: the sub-regulation dealing with eligible consumers availing financial assistance (p2); the registration and approval sub-regulation, which routes registration through the State Nodal Agency in online mode or otherwise, requires acknowledgement and in-principle approval within the timelines in Table-4, and extends those timelines to the Chief Electrical Inspector or other competent authority (p2–3); the Table-3 activity row, which becomes 'Technical Feasibility above 10 kW capacity' (p3); and a new Note 3 below Table 3, under which applications up to 10 kW complete in all respects are deemed accepted without technical feasibility, and for systems above 10 kW the feasibility study must be completed within fifteen days, failing which the proposal is presumed technically feasible (p3). A proviso makes any shorter timelines in the Electricity (Right of Consumers) Rules, as amended from time to time, prevail over Tables 3 and 4 (p3).

Objections and suggestions are to be addressed to the Secretary, HPERC, Shimla, by 31 May 2024 (p1–2).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document