HPERC · Himachal Pradesh Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order
In the matter of finalization of the draft Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Fourth Amendment) Regulations, 2026.
OrderDated 19 Aug 2026Published in the Gazette 15 Jul 2026
Read with the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page HPERC order (p1–2) that finalizes, without change, the draft Fourth Amendment to the Commission's 2015 Rooftop Solar PV Grid Interactive System Regulations. The stated purpose is to simplify rooftop solar adoption under the central PM Surya Ghar: Muft Bijli Yojana, approved by the Government of India on 29 February 2024 (p1).
Paragraphs 1–3 set out the problem and the decision: under the existing 2015 Regulations consumers had to sign a separate Net Metering Agreement with the Discom to install rooftop solar under the scheme, so the Commission decided to accept a Digital Solar Metering Connection Agreement forming part of the online application form on Central/State Government portals, and to let eligible consumers apply in any other online format the Central or State Government provides under any rooftop solar scheme (p1).
Paragraphs 4–8 record the pre-publication process: the draft amendment was notified on 14 July 2026 and published in the Rajpatra on 15 July 2026 under s.181(1) of the Electricity Act 2003; public objections and suggestions were invited by newspaper notice on 21 July 2026; major stakeholders were asked to respond by 17 August 2026; a public hearing was held on 18 August 2026 at which the distribution licensee's representatives made no comment; and, as no stakeholder filed written comments, the Commission approved the draft as finalized and ordered it notified in the Rajpatra (p2). The order carries no in-force date of its own, and the operative amendment text is not reproduced in the pages available here.
Read with this
The regulation
Amendments and corrections
- Dated 6 Nov 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022
- Dated 12 Jun 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026
Commencement notices and reasons
- Dated 31 Jul 2015Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order
- Dated 6 Nov 2018Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order
Procedures and orders made under it
Earlier drafts
- Dated 8 Oct 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft
- Dated 11 Mar 2019Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft
- Dated 5 Jul 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022 — Draft
- Dated 13 May 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft
- Dated 14 Jul 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.