HPERC · Himachal Pradesh Electricity Regulatory Commission

Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order

In the matter of finalization of the draft Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Fourth Amendment) Regulations, 2026.

OrderDated 19 Aug 2026Published in the Gazette 15 Jul 2026

Read with the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page HPERC order (p1–2) that finalizes, without change, the draft Fourth Amendment to the Commission's 2015 Rooftop Solar PV Grid Interactive System Regulations. The stated purpose is to simplify rooftop solar adoption under the central PM Surya Ghar: Muft Bijli Yojana, approved by the Government of India on 29 February 2024 (p1).

Paragraphs 1–3 set out the problem and the decision: under the existing 2015 Regulations consumers had to sign a separate Net Metering Agreement with the Discom to install rooftop solar under the scheme, so the Commission decided to accept a Digital Solar Metering Connection Agreement forming part of the online application form on Central/State Government portals, and to let eligible consumers apply in any other online format the Central or State Government provides under any rooftop solar scheme (p1).

Paragraphs 4–8 record the pre-publication process: the draft amendment was notified on 14 July 2026 and published in the Rajpatra on 15 July 2026 under s.181(1) of the Electricity Act 2003; public objections and suggestions were invited by newspaper notice on 21 July 2026; major stakeholders were asked to respond by 17 August 2026; a public hearing was held on 18 August 2026 at which the distribution licensee's representatives made no comment; and, as no stakeholder filed written comments, the Commission approved the draft as finalized and ordered it notified in the Rajpatra (p2). The order carries no in-force date of its own, and the operative amendment text is not reproduced in the pages available here.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document