Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft

Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) (First Amendment) Regulations, 2018

Draft amendmentDated 8 Oct 2018No. HPERC-H(1)-11/2015 dated 8 th October, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On 8 October 2018 the Himachal Pradesh Electricity Regulatory Commission published, for public objection, a draft First Amendment to its 2015 Rooftop Solar PV Grid Interactive System based on Net Metering Regulations (p1). The notification states the reasons for amending: the national target of 40 GW of rooftop solar by 2022, MNRE's request that service-standard timelines be built into the regulations, HPSEBL's view that no payment should be made for net surplus energy, and HIMURJA's suggestion on permitted capacity for very small consumers (p1). Objections and suggestions are to reach the Secretary within fifteen days of publication in the Rajpatra (p1–2).

The draft then amends named provisions. Regulation 2's definition of "premises" is substituted (p2); regulation 5(2) is replaced with a revised structure of capacity ceilings — a percentage of sanctioned contract demand for two-part-tariff consumers and load-slab limits for single-part-tariff consumers (p2), plus voltage-wise maximum system sizes, rounding of computed capacity, and an obligation on the licensee to keep 30% redundancy in its distribution system and to augment overloaded equipment through its CAPEX plan (p2–3).

Regulation 7 is reworked to replace fixed day-counts with service-standard timelines in new Tables 3 and 4, allocating activities and responsibilities among the consumer, distribution licensee, State Nodal Agency and Chief Electrical Inspector — covering application, meter procurement, installation, inspection, removal of deficiencies, safety certification, synchronisation, billing and the subsidy chain (p3–5). Regulation 9 is amended on metering accuracy, mandatory check meters above a capacity threshold and who bears meter cost (p5–6). Regulation 10(9) is amended on payment for net surplus energy — reducing the payable rate where subsidy or grant crosses half the capital cost, and barring payment altogether for letters of approval issued on or after 01.11.2018 — and on other charges and low-voltage supply surcharge (p6–7).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Standards of performance, Metering

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document