In the matter of draft Order of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) Order, 2019.
OrderDated 30 Mar 2019Published in the Gazette 14 Mar 2019
Made under the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This short order finalises the HPERC (Rooftop Solar PV Grid Interactive System based on Net Metering) Order, 2019 — the instrument that sets the rate at which a distribution licensee pays its domestic rooftop solar consumers for net energy credits left unadjusted at the end of the settlement period.
Paras 1–2 (p1) set out the pedigree: the 2015 Net Metering Regulations, published in the Rajpatra on 3 August 2015, and their First Amendment Regulations, 2018, notified 6 November 2018, whose amended Regulation 10(9)(b)(ii) governs payment for consumers whose Letter of Approval issues after 15.11.2018.
Paras 3–7 (p1–2) give the Commission's reasoning: rooftop solar is primarily for self-consumption, the licensee in effect provides banking, and the surplus left at settlement is a contingent residual that cannot be marketed at attractive prices. The rate is therefore fixed as a fraction of the licensee's annual weighted average purchase rate from ground-mounted solar PV plants up to 5.00 MW in the State. The draft Order was notified 11 March 2019, gazetted 14 March 2019 and publicised in two newspapers on 16 March 2019.
Paras 8–11 with the Commission's View (p2–3) record the consultation: HPSEBL accepted the proposal, while the Consumer Representative welcomed it but asked for a mechanism should the 70% subsidy be withdrawn later. The Commission declined that for now, noting it can take a view when such situations arise, and approved the draft Order unchanged, to be notified separately (p3).
Read with this
The regulation
Amendments and corrections
- Dated 6 Nov 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022
- Dated 12 Jun 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026
Commencement notices and reasons
- Dated 31 Jul 2015Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order
- Dated 6 Nov 2018Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 8 Oct 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft
- Dated 11 Mar 2019Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft
- Dated 5 Jul 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022 — Draft
- Dated 13 May 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft
- Dated 14 Jul 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.