HPERC · Himachal Pradesh Electricity Regulatory Commission

Rooftop Solar PV Net Metering Order, 2019 — Finalisation Order

In the matter of draft Order of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) Order, 2019.

OrderDated 30 Mar 2019Published in the Gazette 14 Mar 2019

Made under the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This short order finalises the HPERC (Rooftop Solar PV Grid Interactive System based on Net Metering) Order, 2019 — the instrument that sets the rate at which a distribution licensee pays its domestic rooftop solar consumers for net energy credits left unadjusted at the end of the settlement period.

Paras 1–2 (p1) set out the pedigree: the 2015 Net Metering Regulations, published in the Rajpatra on 3 August 2015, and their First Amendment Regulations, 2018, notified 6 November 2018, whose amended Regulation 10(9)(b)(ii) governs payment for consumers whose Letter of Approval issues after 15.11.2018.

Paras 3–7 (p1–2) give the Commission's reasoning: rooftop solar is primarily for self-consumption, the licensee in effect provides banking, and the surplus left at settlement is a contingent residual that cannot be marketed at attractive prices. The rate is therefore fixed as a fraction of the licensee's annual weighted average purchase rate from ground-mounted solar PV plants up to 5.00 MW in the State. The draft Order was notified 11 March 2019, gazetted 14 March 2019 and publicised in two newspapers on 16 March 2019.

Paras 8–11 with the Commission's View (p2–3) record the consultation: HPSEBL accepted the proposal, while the Consumer Representative welcomed it but asked for a mechanism should the 70% subsidy be withdrawn later. The Commission declined that for now, noting it can take a view when such situations arise, and approved the draft Order unchanged, to be notified separately (p3).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.