Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022 — Draft
Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Second Amendment) Regulations, 2022
Draft amendmentDated 5 Jul 2022No. HPERC-H(1)-11/2015 dated the 5th July, 2022
Draft
A proposal that has since been finalised as the Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft of the Second Amendment to Himachal Pradesh's rooftop solar net-metering regulations, issued by HPERC on 5 July 2022 under notification No. HPERC-H(1)-11/2015 (p1). The Commission says it is aligning the 2015 Rooftop Solar Regulations (first amended in 2018) with the Electricity (Rights of Consumers) Rules, 2020 and their 2021 amendment, and publishes the draft for objections for thirty days from its Rajpatra publication (p1). The amendment regulations are to come into force on 1 September 2022 (p2).
The draft recasts the scheme from a single net-metering regime into three parallel arrangements. Regulation 4 is replaced wholesale with general principles for net metering, net billing and group metering, each with its own capacity band, metering hardware and accounting basis, plus a one-time switch-over option for consumers who had already installed or applied (p5–8). The definitions in Regulation 2 are expanded or replaced to match: applicable retail tariff, Electricity Supply Code, gross metering, gross meter, group metering, net billing, net billing meter, a rewritten net-metering definition, prosumer and a new settlement period (p2–4). Regulation 3's applicability clause is rewritten so the Regulations bind the Distribution Licensee and eligible consumers installing under net metering, net billing or group metering, with gross metering expressly left to other Commission regulations (p4–5).
Regulation 10 is the heaviest rewrite: it splits the accounting principles between net metering and net billing, adds billing and settlement mechanics for net billing, prescribes how exported energy is valued (including a subsidy-linked table), when the Distribution Licensee's payment falls due and the interest on delay, and how late payment surcharge is netted off (p11–16). Metering under Regulation 9 is generalised from "net meter" to the meter required under the relevant arrangement, with CMRI and remote-communication ports (p11). Application processing under Regulation 7 moves to a web-based online system, with revised timelines and a note on consumer-supplied meters (p9–11). Regulation 5 (eligibility/Table-1), Regulation 6 and the title itself are conformed — the words "based on Net Metering" are dropped throughout — and Regulation 11 is omitted (p2, p9, p16). Form-1 is replaced and Form-2 is retitled the Solar Metering Connection Agreement (p16–18).
Read with this
The regulation
Amendments and corrections
- Dated 6 Nov 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022
- Dated 12 Jun 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026
Commencement notices and reasons
- Dated 31 Jul 2015Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order
- Dated 6 Nov 2018Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 8 Oct 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft
- Dated 11 Mar 2019Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft
- Dated 13 May 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft
- Dated 14 Jul 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.