HPERC · Himachal Pradesh Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022
Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Second Amendment) Regulations, 2022
AmendmentDated 14 Sep 2022In force from 1 Sep 2022No. HPERC-H(1)-11/2015 dated the 14th September, 2022
Amends the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to HPERC's rooftop solar regulations, notified at Shimla on 14 September 2022 but brought into force from 1 September 2022, i.e. with backdated commencement (p1). It converts a net-metering-centric 2015 framework into a multi-mechanism framework covering net metering, net billing and group metering, and strips "based on Net Metering" from the parent title (p1).
Regulation 3 rewrites the definitional regulation, introducing gross metering, gross meter, group metering, net billing, net billing meter, a narrowed definition of net-metering, Prosumer, settlement period, applicable retail tariff and Electricity Supply Code (p1–4). Regulation 4 replaces the applicability provision, limiting the Regulations to net metering, net billing and group metering, and expressly routing gross metering to the Commission's RE tariff, open access and deviation settlement regulations (p4).
Regulation 5 substitutes the General Principles, assigning each mechanism to a capacity band — net metering up to 50 kWp, net billing above 50 kWp up to 1.00 MWp, group metering above 20 kWp up to 1.00 MWp — and setting out group-metering agreements, energy allocation and a percentage deduction by the licensee (p4–7). It also gives consumers who had installed or started approvals before 1 September 2022 a one-time option to switch arrangements (p8).
Regulations 6–10 make consequential changes to eligibility publicity, application and approval procedure, processing timelines, inspection rights and meter specifications including CMRI and remote-communication ports (p8–11). Regulation 11 rewrites the accounting regulation: separate regimes for net metering and net billing, the general principles applying to all arrangements, the export valuation rate tied to the licensee's ground-mounted solar purchase rates with subsidy-linked percentages in Table-5, the 30 June payment deadline and 12% interest (p11–16). Regulation 12 omits Regulation 11 of the parent; Regulations 13–14 replace Form-1 and amend Form-2 (p16–18).
Read with this
The regulation
Amendments and corrections
- Dated 6 Nov 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018
- Dated 12 Jun 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026
Commencement notices and reasons
- Dated 31 Jul 2015Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order
- Dated 6 Nov 2018Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 8 Oct 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft
- Dated 11 Mar 2019Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft
- Dated 5 Jul 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022 — Draft
- Dated 13 May 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft
- Dated 14 Jul 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.