HPERC · Himachal Pradesh Electricity Regulatory Commission

Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022

Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Second Amendment) Regulations, 2022

AmendmentDated 14 Sep 2022In force from 1 Sep 2022No. HPERC-H(1)-11/2015 dated the 14th September, 2022

Amends the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to HPERC's rooftop solar regulations, notified at Shimla on 14 September 2022 but brought into force from 1 September 2022, i.e. with backdated commencement (p1). It converts a net-metering-centric 2015 framework into a multi-mechanism framework covering net metering, net billing and group metering, and strips "based on Net Metering" from the parent title (p1).

Regulation 3 rewrites the definitional regulation, introducing gross metering, gross meter, group metering, net billing, net billing meter, a narrowed definition of net-metering, Prosumer, settlement period, applicable retail tariff and Electricity Supply Code (p1–4). Regulation 4 replaces the applicability provision, limiting the Regulations to net metering, net billing and group metering, and expressly routing gross metering to the Commission's RE tariff, open access and deviation settlement regulations (p4).

Regulation 5 substitutes the General Principles, assigning each mechanism to a capacity band — net metering up to 50 kWp, net billing above 50 kWp up to 1.00 MWp, group metering above 20 kWp up to 1.00 MWp — and setting out group-metering agreements, energy allocation and a percentage deduction by the licensee (p4–7). It also gives consumers who had installed or started approvals before 1 September 2022 a one-time option to switch arrangements (p8).

Regulations 6–10 make consequential changes to eligibility publicity, application and approval procedure, processing timelines, inspection rights and meter specifications including CMRI and remote-communication ports (p8–11). Regulation 11 rewrites the accounting regulation: separate regimes for net metering and net billing, the general principles applying to all arrangements, the export valuation rate tied to the licensee's ground-mounted solar purchase rates with subsidy-linked percentages in Table-5, the 30 June payment deadline and 12% interest (p11–16). Regulation 12 omits Regulation 11 of the parent; Regulations 13–14 replace Form-1 and amend Form-2 (p16–18).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Net billing, Metering

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.