Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order

In the matter of draft Regulations of the Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) Regulations, 2015.

OrderDated 31 Jul 2015

Read with the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's order disposing of the objections and suggestions received on the draft HPERC (Rooftop Solar PV Grid Interactive System based on Net Metering) Regulations, 2015, and approving the finalised draft for notification. Paragraph 1 (p1) records the pre-publication history: the draft was published in the Rajpatra Himachal Pradesh on 24 January 2015 under sections 61, 66 and 86(1)(e) of the Electricity Act 2003, objections were invited through two newspapers on 25 January 2015 with a 30-day window, and the deadline was extended to 16 March 2015 on HPSEB Ltd's request. Comments came from a consumer representative, HPSEB Ltd, HIMURJA and HPPCL (p1–2).

Paragraph 2 (p2–11) takes twenty-five stakeholder points one by one and states the Commission's decision on each. The definitional issues dominate the early pages: a solar meter is to be defined, the system is to be described as "grid interactive", and "eligible consumer" is widened to all categories of distribution licensee consumers, including LT consumers, with voltage-wise ceilings on installed capacity — 5 kWp for LT single-phase, 15 kWp for LT three-phase and 1 MWp for HT/EHT (p2–3). Capacity is to be related to sanctioned load/contract demand and, through the 30% ceiling, to the distribution transformer (p4–5).

On procedure, the Commission directs that application, registration and commissioning timelines be written into the regulations but declines to prescribe any fee at this stage (p6); it rejects HIMURJA verification of completion reports, keeping site verification with the distribution licensee, requires anti-islanding protection on all grid-interactive systems, and does not make wireless meter reading mandatory (p6–7).

The most substantive addition is the settlement clause inserted at p8: annual settlement of surplus energy at fixed rates for single-part-tariff and two-part-tariff consumers, halved where government subsidy or grant exceeds 50% of capital cost, with power to revise the rates by order. Demand charges are to be billed on net demand within a demand period (p7–8). Open access consumers get separate energy accounting for open access time blocks, and merchant-power developers interfacing elsewhere fall outside the regulations (p9–10). Registration with HIMURJA is required, and solar trees are treated as covered by the rooftop solar definition (p10–11). The order closes by approving the finalised regulations for notification (p11).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Renewable energy tariff, Subsidy and cross-subsidy

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document