HPERC · Himachal Pradesh Electricity Regulatory Commission

Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft

Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System based on Net Metering) Order, 2019

Draft orderDated 11 Mar 2019No. HPERC-H-(1)-11/2017 dated 11th March, 2019

Draft

A proposal that has since been finalised as the Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Himachal Pradesh Electricity Regulatory Commission issued this consultation notice from Shimla on 11 March 2019 (p1) to publish a draft order fixing what distribution licensees must pay domestic rooftop-solar net-metering consumers for energy credits left unadjusted at the end of a settlement period.

Pages 1–2 are the statement of reasons. They recall the 2015 Net Metering Regulations, published in the Rajpatra of Himachal Pradesh on 3 August 2015, and the First Amendment Regulations, 2018, notified on 6 November 2018, and quote the amended Regulation 10(9)(b)(ii)(a), which requires the rate for domestic consumers to be determined taking into account the subsidy available to them under State or Central schemes (p1). The Commission's reasoning is that rooftop solar is primarily for self-consumption, that the licensee effectively banks the consumer's energy, that the licensee bears bi-directional flow losses and system-strengthening costs, and that unadjusted year-end energy is a contingent surplus that cannot be marketed at attractive prices (p1–2). It therefore proposes to pay a fraction of the weighted average rate at which the licensee purchases power from ground-mounted solar PV plants of up to 5 MW in the State, computed on an annual basis (p2).

Pages 2–3 contain the draft order. Clause 2 limits it to domestic supply consumers whose Letter of Approval to install a net-metered rooftop system was issued after 15 November 2018 and who have then installed an MNRE-approved grid-connected system (p2–3). Clause 3 makes the distribution licensee compute the per-kWh rate for each settlement period, subject to the 2015 Regulations and to later Commission orders, pay eligible consumers over the 25-year useful life of the system, and publish the weighted average rate on its website each year by 15 February (p3).

Suggestions or objections may be filed, in English and with the sender's full name, postal and e-mail address, within fourteen days of publication in the Rajpatra (p2).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Renewable energy tariff

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.