HPERC · Himachal Pradesh Electricity Regulatory Commission
Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015
Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015
RegulationDated 31 Jul 2015No. HPERC– H (1)-11/2015 dated the 31st July, 2015
4 amendments to it are on Voltaic, the latest dated 19 Aug 2026.
Summary
Summary written by software. Check the regulator's original before you rely on it.
HPERC's Net Metering Regulations, 2015 (notification of 31 July 2015) build the state's framework for grid-connected rooftop solar PV under net metering. The preamble (p1) anchors the regulation in the National Electricity Policy and the Central Government's solar targets and states the purpose: let consumers offset their own consumption, inject surplus into the grid and take the value back through their bills.
Regulations 1–2 (p2–3) give the title and commencement — in force on publication in the Rajpatra, whose date is not printed — and define the working vocabulary: eligible consumer, net meter, solar meter, net metering, settlement period, obligated entity, accuracy class index and more. Reg 3(2) preserves the right of State authorities to run rooftop solar projects through alternative mechanisms. Regulation 4 states the entitlement to install and inject surplus. Regulation 5 (p4) sets who may participate and the capacity ceilings — a share of sanctioned contract demand or connected load, absolute ceilings by voltage level, a cumulative cap per distribution transformer, and first-come-first-serve allocation; reg 6 makes the licensee publish transformer-wise headroom (p4–5).
Regulation 7 (p5–6) is the operational spine: Form-1 application, acknowledgement, feasibility check, letter of approval, Form-2 agreement, work-completion report, meter sealing and commissioning, and registration with HIMURJA for consumers seeking financial assistance. Regulation 8 (p6–7) imports CEA connectivity and safety standards and anti-islanding protection; regulation 9 (p7) covers the metering arrangement. Regulation 10 (p8–10) is the settlement engine: net-flow billing, carry-forward of export as electricity credit within a settlement period, separate time-of-day accounting, fixed rates for credits left unadjusted at settlement (halved where subsidy exceeds half the capital cost), demand charges on net draw, and no payment for deemed generation. Regulation 11 exempts the arrangement from wheeling, banking and cross-subsidy surcharge for five years; regs 12–13 deal with RPPO credit and REC-seeking generators; regs 14–19 tie in the performance standards and give the Commission powers to remove difficulties, direct, relax and amend. Forms-1 and 2 follow at p13–16.
Read with this
Amendments and corrections
- Dated 6 Nov 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022
- Dated 12 Jun 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026
Commencement notices and reasons
- Dated 31 Jul 2015Rooftop Solar PV Net Metering Regulations, 2015 — Finalisation Order
- Dated 6 Nov 2018Rooftop Solar PV Net Metering Regulations, 2015 — First Amendment, 2018 — finalisation order
- Dated 14 Sep 2022Rooftop Solar PV Grid Interactive System Regulations, 2015 — Second Amendment, 2022 — Finalisation Order
- Dated 19 Aug 2026Rooftop Solar PV Grid Interactive System (Fourth Amendment) Regulations, 2026 — Finalization Order
Procedures and orders made under it
Earlier drafts
- Dated 8 Oct 2018Rooftop Solar PV Grid Interactive System based on Net Metering Regulations, 2015 — First Amendment, 2018 — Draft
- Dated 11 Mar 2019Rooftop Solar PV Grid Interactive System based on Net Metering Order, 2019 — Draft
- Dated 5 Jul 2022Rooftop Solar PV Grid Interactive System (Second Amendment) Regulations, 2022 — Draft
- Dated 13 May 2024Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024 — Draft
- Dated 14 Jul 2026Rooftop Solar PV Grid Interactive System Regulations, 2015 — Fourth Amendment, 2026 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.