Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015

Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive Systems based on Net Metering) Regulations, 2015

RegulationDated 31 Jul 2015No. HPERC– H (1)-11/2015 dated the 31st July, 2015

4 amendments to it are on Voltaic, the latest dated 19 Aug 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

HPERC's Net Metering Regulations, 2015 (notification of 31 July 2015) build the state's framework for grid-connected rooftop solar PV under net metering. The preamble (p1) anchors the regulation in the National Electricity Policy and the Central Government's solar targets and states the purpose: let consumers offset their own consumption, inject surplus into the grid and take the value back through their bills.

Regulations 1–2 (p2–3) give the title and commencement — in force on publication in the Rajpatra, whose date is not printed — and define the working vocabulary: eligible consumer, net meter, solar meter, net metering, settlement period, obligated entity, accuracy class index and more. Reg 3(2) preserves the right of State authorities to run rooftop solar projects through alternative mechanisms. Regulation 4 states the entitlement to install and inject surplus. Regulation 5 (p4) sets who may participate and the capacity ceilings — a share of sanctioned contract demand or connected load, absolute ceilings by voltage level, a cumulative cap per distribution transformer, and first-come-first-serve allocation; reg 6 makes the licensee publish transformer-wise headroom (p4–5).

Regulation 7 (p5–6) is the operational spine: Form-1 application, acknowledgement, feasibility check, letter of approval, Form-2 agreement, work-completion report, meter sealing and commissioning, and registration with HIMURJA for consumers seeking financial assistance. Regulation 8 (p6–7) imports CEA connectivity and safety standards and anti-islanding protection; regulation 9 (p7) covers the metering arrangement. Regulation 10 (p8–10) is the settlement engine: net-flow billing, carry-forward of export as electricity credit within a settlement period, separate time-of-day accounting, fixed rates for credits left unadjusted at settlement (halved where subsidy exceeds half the capital cost), demand charges on net draw, and no payment for deemed generation. Regulation 11 exempts the arrangement from wheeling, banking and cross-subsidy surcharge for five years; regs 12–13 deal with RPPO credit and REC-seeking generators; regs 14–19 tie in the performance standards and give the Commission powers to remove difficulties, direct, relax and amend. Forms-1 and 2 follow at p13–16.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Energy accounting and settlement, Metering

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.