Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Rooftop Solar PV Grid Interactive System Regulations, 2015 — Third Amendment, 2024

Himachal Pradesh Electricity Regulatory Commission (Rooftop Solar PV Grid Interactive System) (Third Amendment) Regulations, 2024

AmendmentDated 12 Jun 2024No. HPERC-H(1)-11/2015 dated 12th June, 2024

Amends the Rooftop Solar PV Grid Interactive Systems based on Net Metering Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to HPERC's 2015 Rooftop Solar PV Grid Interactive System Regulations, issued as Notification No. HPERC-H(1)-11/2015 dated 12 June 2024 (p1). It comes into force from the date of publication in the Rajpatra, Himachal Pradesh, which is not printed on the face of the document (p1).

The amendment does four things. It inserts a new definition of 'State Nodal Agency' into Regulation 2, naming the Himachal Pradesh Energy Development Agency (HIMURJA) or the Himachal Pradesh State Electricity Board Limited (the distribution licensee) as the body designated to implement rooftop solar schemes (p1). It replaces the two capacity tables under Regulation 5 with new tables keyed respectively to the consumer's sanctioned connected load and to the voltage at which the consumer is supplied, and adds a sub-regulation for systems not exceeding 10 kW — no technical feasibility, deemed enhancement of sanctioned load, and consequential treatment of supply charges and additional security under two other HPERC regulations (p1–2).

Under Regulation 7 it makes feasibility checking conditional ('where required'), substitutes the registration-and-subsidy sub-regulation keyed to the State Nodal Agency and Table-4 timelines, and substitutes the sub-regulation requiring the licensee, eligible consumers, nodal agency and Chief Electrical Inspector to adhere to the Table-3 and Table-4 timelines, subject to a proviso that shorter timelines under the Electricity (Rights of Consumers) Rules, 2020 prevail (p2–3). Table-3 item 3 is retitled 'Technical Feasibility above 10 kW capacity', and a new Note 3 provides deemed acceptance for complete applications up to 10 kW and a fifteen-day feasibility window for systems above 10 kW, after which the proposal is presumed feasible (p3).

Standard name
Net Metering and Rooftop Solar
Primary topics
New connections and load changes, Standards of performance

Read with this

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document