GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
Explanatory Note for Draft Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Second Amendment) Regulations, 2019
Explanatory memorandum to a draftDated 16 Feb 2014
Draft
The draft has since been finalised as the Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020.
Explanatory memorandum to a draft that is not on Voltaic.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The document is GERC's explanatory note for the draft GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Second Amendment) Regulations, 2019 (p1). It explains why the Commission proposes to amend the 2005 Regulations (Notification No. 9 of 2005) and the First Amendment of 2010 (Notification No. 2 of 2010), which currently govern recovery of expenditure from consumers for supply connections (p1).
Pages 1–2 set out the problem. GUVNL filed Petition No. 1829 of 2019 seeking approval to levy per kVA charges from applicants for expenditure on supplying power at 11 kV / 22 kV for new HT connections or additional demand (p1). Under the 2005 Regulations, LT new connections/load extension may be charged on a per kW basis; state-owned distribution licensees have followed that since 01.01.2011 with Commission-approved charges (p1). For HT/EHT applications, licensees recover actual expenditure under Regulation 5, based on latest cost data. The note says this produces widely varying estimates because charges depend on distance from existing feeders/substations and spare capacity, causing non-uniformity, a sense of injustice among applicants and conflict with DISCOM officials (p1–2). It gives examples: a small demand may require a long new feeder, while a large demand near existing capacity may need only a short line; a first applicant who funds a feeder may later pay heavily again for additional load (p2).
Page 3 records the proposed remedy: expenditure for HT connections should be reconsidered using normative feeder cost and a defined load-catering capacity, with GUVNL proposing a per kVA methodology. TPL supported per kW charges but said its costs differ because its network is mostly underground cable (p3). The note concludes that Regulation 5 of the 2005 Regulations must be amended, and states that the Commission has published the draft Second Amendment Regulations, 2019 (p3, p5).
Pages 3–5 reproduce the enabling provisions: Electricity Act 2003 sections 45, 46 and 181(2)(u); Regulation 22 of the GERC (Distribution Licence) Regulations, 2005; and Regulation 5 of the 2005 Regulations on HT/EHT supply (p3–5). The note is a consultation/rationale document; it does not itself set the amended charges.
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.