Skip to content

GERC · Gujarat Electricity Regulatory Commission

Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons

GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2023

Statement of reasonsDated 5 Dec 2023

The commission's reasons for the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

What it is. The Statement of Reasons behind the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2023 — the Commission's account of why it accepted or rejected stakeholder objections to the draft third amendment of its 2005 recovery-of-expenditure regulations (p1, p8).

Background (p1–2). The Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (notification of 31.12.2020, amended 28.06.2021) and a Ministry letter of 18.01.2021 asked state regulators to align their regulations. GERC published draft Third Amendment Regulations 2022 on 21.02.2022 in two Gujarati dailies and one English daily, with comments due 25.03.2022, and held a public hearing on 04/05/2022. Six objectors responded and four took part in the hearing (p2, p9).

Substance. Section 3 works through the objections. On the definition of "Temporary Service" (Clause 2.1(xvii)) the Commission kept the draft wording, clarifying that "classifications of installation" means classification by system of supply under the Supply Code, that a temporary consumer need not execute an agreement, and that extensions follow the Supply Code (pp2–4). On Clause 7(vi) it kept the 30-day refund window and rejected refunds only through electricity bills, Bank Rate interest and electronic-only refunds; accepted renaming "Late Payment Charge" as "Delayed Payment Charge"; and reproduced the revised clause (pp4–7). Section 4 amends Clause 8(ii) of the Principal Regulations so that meter testing fees under Clause 8.2(E)(f) are no longer payable in advance, matching GoI Rule 5(8) and the GERC (SoP) Regulations, 2023 (pp7–8). Annexures 1–2 name the objectors and hearing participants (p9).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, Late payment surcharge and rebate, Metering

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document