GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2023
Statement of reasonsDated 5 Dec 2023
The commission's reasons for the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
What it is. The Statement of Reasons behind the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2023 — the Commission's account of why it accepted or rejected stakeholder objections to the draft third amendment of its 2005 recovery-of-expenditure regulations (p1, p8).
Background (p1–2). The Ministry of Power's Electricity (Rights of Consumers) Rules, 2020 (notification of 31.12.2020, amended 28.06.2021) and a Ministry letter of 18.01.2021 asked state regulators to align their regulations. GERC published draft Third Amendment Regulations 2022 on 21.02.2022 in two Gujarati dailies and one English daily, with comments due 25.03.2022, and held a public hearing on 04/05/2022. Six objectors responded and four took part in the hearing (p2, p9).
Substance. Section 3 works through the objections. On the definition of "Temporary Service" (Clause 2.1(xvii)) the Commission kept the draft wording, clarifying that "classifications of installation" means classification by system of supply under the Supply Code, that a temporary consumer need not execute an agreement, and that extensions follow the Supply Code (pp2–4). On Clause 7(vi) it kept the 30-day refund window and rejected refunds only through electricity bills, Bank Rate interest and electronic-only refunds; accepted renaming "Late Payment Charge" as "Delayed Payment Charge"; and reproduced the revised clause (pp4–7). Section 4 amends Clause 8(ii) of the Principal Regulations so that meter testing fees under Clause 8.2(E)(f) are no longer payable in advance, matching GoI Rule 5(8) and the GERC (SoP) Regulations, 2023 (pp7–8). Annexures 1–2 name the objectors and hearing participants (p9).
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.