GERC · Gujarat Electricity Regulatory Commission

Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2023

AmendmentDated 5 Dec 2023Published in the Gazette 6 Dec 2023Notification No. 05 of 2023 dated 05/12/2023

Amends the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Third Amendment to GERC's 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges. It was published in the Gujarat Government Gazette (Extraordinary, Part IV-C) of 6 December 2023 and comes into force from that gazette notification; it extends to the whole of Gujarat and is issued under s.181(2)(u) read with ss.45 and 46 of the Electricity Act, 2003 (p1).

The operative text is short and touches four provisions of the 2005 Principal Regulations. Clause 2 substitutes the Chapter II definition of "Temporary Service", recasting it as supply given initially for a limited period, subject to review for further extension in line with the permanent-supply installation classifications (p2). Clause 3 rewrites Chapter VII's refund and recovery rules: excess amounts deposited are to be refunded to the applicant/consumer within a fixed window after energisation, by account-payee cheque or electronic mode, with interest at the prevailing Delayed Payment Charge rate if the licensee is late; the consumer must receive an item-wise bill comparing estimated and actual expenditure, and any further information sought within a stated time (p2). Clause 3 also substitutes the rule on expenditure incurred in excess of the deposit, making it payable within a stated period of demand and otherwise debitable to the consumer's next electricity bill (p2). Clause 4 makes the miscellaneous charges listed in clauses 8.1 and 8.2 payable in advance, with one stated exception (p2).

The amendment sets process and timelines only; the charge amounts themselves sit in the Principal Regulations and the prevailing Tariff Order.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Billing and payment

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document