GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
Draft GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fifth Amendment) Regulations, 2025
Draft amendmentDated 26 Sep 2025
Draft
A proposal that has since been finalised as the Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the draft Fifth Amendment to GERC's 2005 Regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges. It is issued by the Gujarat Electricity Regulatory Commission under s.181(2)(u) read with ss.45 and 46 of the Electricity Act, 2003, extends to the whole of Gujarat, and is to come into force on the date of publication in the Official Gazette (p1).
The instrument does one thing: it substitutes Clause 8.2(F) of Chapter VIII of the Principal Regulations (Notification No. 9 of 2005), the clause headed "Charges for Miscellaneous Work" (p1). The substituted text fixes how a supplier charges for work it undertakes for a consumer that is not already covered by the existing schedule — on a cost-of-labour-and-materials basis plus an overhead mark-up, payable in advance, with estimates to be submitted where necessary. A second limb applies the same cost-plus basis to work the supplier undertakes as agency work on the consumer's behalf. A proviso then deals separately with infrastructure development, requiring the Infrastructure Developer to pay supervision/overhead charges to the owner of the transmission or distribution line (p1).
Clause 1 supplies the short title, extent and commencement. The document closes with the Secretary's signature and the date and place of issue (p2).
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.