Skip to content

GERC · Gujarat Electricity Regulatory Commission

Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005

Gujarat Elecnicity Regulatory Commission (Licensee'J Power to Recover Expenditure incurred in providing supply and other Miscellaneous Charges) Regulations, 2005

RegulationDated 31 Mar 2005Published in the Gazette 31 Mar 2005No. 9 of 2005

4 amendments to it are on Voltaic, the latest dated 14 Oct 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Gujarat Electricity Regulatory Commission made these Regulations as Notification No. 9 of 2005, gazetted in the Gujarat Government Gazette (Extraordinary), Part IV-C, on 31 March 2005; they take effect on that publication date (p1, p13). They bind every distribution licensee in its licensed area in Gujarat and fix what a licensee may charge a person seeking a new or altered supply (p1).

Chapter I states the title, applicability and commencement (p1). Chapter II defines the working vocabulary — distribution system, service line, electrical plant, electric line, sub-station, temporary service — and fixes the LT/HT/EHT voltage bands, with residual interpretation rules and the Bombay General Clauses Act, 1904 (p2–4).

Chapter III confirms the duty to supply under section 43 and the licensee's right to recover expenditure it reasonably incurs on an electric line or plant provided specifically for an applicant, and makes the service line the licensee's property (p4). Chapters IV and V set the estimating method: LT works, transformer and switchgear costs shared pro-rata by contracted load, HT line extension on a per-km basis, and HT/EHT line and substation works, with the transmission licensee involved for EHT; certain consumer categories are excluded from recovery (p4–6). Chapter VI requires a published cost data book as the estimating basis (p6).

Chapter VII governs deposits, adjustment to actual cost plus supervision charges, refunds and deductions on withdrawal, and the accounting treatment — amounts recovered reduce gross fixed assets and are excluded from the equity base and from depreciation (p6–8). Chapter VIII is the fee schedule: pre-connection registration, re-estimate, test and inspection charges; post-connection charges for load change, name transfer, reconnection and meter hire; fuse attendance, resealing and meter/CT testing; and residual works at actual cost plus overheads (p8–13). Chapters IX–XI reserve powers to remove difficulties, issue directions and amend (p13).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Metering

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of GERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document