GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fourth Amendment) Regulations, 2024
AmendmentDated 23 Sep 2024Published in the Gazette 23 Sep 2024Notification No. 15 of 2024 (GERC/2024/15/Tech-II/1792) dated 23/09/2024
Amends the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short GERC amendment regulation, published in the Gujarat Government Gazette (Extraordinary), Part IV-C, of 23 September 2024, as Notification No. 15 of 2024 (p1). It amends the Commission's 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges — the Principal Regulations, Notification No. 9 of 2005 (p1).
The operative change is a single substituted provision: clause 4.2(ii) of Chapter IV is replaced in full (p2). The new text requires that where an application needs laying or extension of an HT line in addition to erection of electrical plant such as DTR and switchgear, the cost of that section of HT line is to be estimated on a per-kilometre basis using the latest cost data published by the Distribution Licensee (p2).
The substituted clause also restates who pays: the Distribution Licensee recovers cost computed under sub-clauses 4.2(i) and 4.2(ii) from all applicants, excluding four categories — agricultural consumers, except agricultural connections under special schemes such as a future "Tatkal Scheme"; water works and sewerage pumps operated by or for a local authority other than a Municipal Corporation; domestic consumers; and LT commercial consumers (p2).
It extends to the whole of Gujarat and comes into force on Gazette publication, 23 September 2024 (p1). It is signed by the Secretary, GERC, dated 23/09/2024 (p2). Page 3 of the PDF is blank.
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.