Skip to content

GERC · Gujarat Electricity Regulatory Commission

Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fifth Amendment) Regulations, 2025

Statement of reasonsDated 14 Oct 2025

The commission's reasons for the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Statement of Reasons (SoR) that accompanies GERC's Fifth Amendment to its 2005 Regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges. It is a reasoning-and-consultation record rather than the amending notification itself: it explains why Clause 8.2(F) ("Charges for Miscellaneous Work") is being changed and directs that the amendment be published in the Official Gazette after the changes are incorporated (pp1, 6).

Part A (pp1–3) recites the existing Clause 8.2(F) — recovery of the actual cost of labour and materials plus overheads for miscellaneous and agency work — and traces the trigger: the Commission's order of 03.12.2024 in Petition No. 2289 of 2023 filed by DGVCL and others, in which it held that Regulations 6 and 8.2 require amendment so that lower supervision charges apply to line-shifting work for National Highway, State Highway and other government infrastructure projects, and directed staff to issue a draft amendment with public notice.

Part B (pp3–4) records the consultation: Draft Fifth Amendment Regulations dated 26.09.2025, public notices on 27.09.2025 in two Gujarati dailies and one English daily, and a public hearing on 10.10.2025. Part C (p4) sets out two stakeholder suggestions — that any relaxation be confined to projects executed by central or state governments rather than private developers, and that "other infrastructure projects" be clarified. Part D (pp4–5) accepts them, holding that the phrase refers to the projects covered by the CEA – Ministry of Power Standard Operating Procedure dated 03.03.2023, and reproduces the finalised Clause F with a proviso requiring Infrastructure Developers to pay supervision/overhead charges to the owner of the transmission/distribution line. Part E (p6) directs gazette publication, and Annexure-I (p7) lists the stakeholders who commented.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document