GERC · Gujarat Electricity Regulatory Commission
Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fifth Amendment) Regulations, 2025
Statement of reasonsDated 14 Oct 2025
The commission's reasons for the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) that accompanies GERC's Fifth Amendment to its 2005 Regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges. It is a reasoning-and-consultation record rather than the amending notification itself: it explains why Clause 8.2(F) ("Charges for Miscellaneous Work") is being changed and directs that the amendment be published in the Official Gazette after the changes are incorporated (pp1, 6).
Part A (pp1–3) recites the existing Clause 8.2(F) — recovery of the actual cost of labour and materials plus overheads for miscellaneous and agency work — and traces the trigger: the Commission's order of 03.12.2024 in Petition No. 2289 of 2023 filed by DGVCL and others, in which it held that Regulations 6 and 8.2 require amendment so that lower supervision charges apply to line-shifting work for National Highway, State Highway and other government infrastructure projects, and directed staff to issue a draft amendment with public notice.
Part B (pp3–4) records the consultation: Draft Fifth Amendment Regulations dated 26.09.2025, public notices on 27.09.2025 in two Gujarati dailies and one English daily, and a public hearing on 10.10.2025. Part C (p4) sets out two stakeholder suggestions — that any relaxation be confined to projects executed by central or state governments rather than private developers, and that "other infrastructure projects" be clarified. Part D (pp4–5) accepts them, holding that the phrase refers to the projects covered by the CEA – Ministry of Power Standard Operating Procedure dated 03.03.2023, and reproduces the finalised Clause F with a proviso requiring Infrastructure Developers to pay supervision/overhead charges to the owner of the transmission/distribution line. Part E (p6) directs gazette publication, and Annexure-I (p7) lists the stakeholders who commented.
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.