Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft

Explanatory Note for Draft Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fourth Amendment) Regulations, 2024

Explanatory memorandum to a draftDated 31 Aug 2024

Explanatory memorandum to the Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's explanatory note issued alongside the draft Fourth Amendment to the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations, 2005. It does not itself fix charges; it sets out why the amendment is proposed (p1).

The note records that consumer organisations asked for the load threshold for Low Tension connections to be raised from 100 kVA/kW to 150 kVA/kW, and that those requests were sent to ESCRP (p1). It then summarises communications from the Ministry of Power on facilitating release of new connections, referring to the Electricity (Rights of Consumers) Rules, 2020 and to Rule 13, under which connection charges for electrified areas up to a specified load are fixed on the basis of load, category of connection and the distribution licensee's average cost of connection, and to the advice that DISCOMs provide LT supply for up to 150 kW (p1).

ESCRP, in the Minutes of its 26th Meeting, recommended amending Clause 3.2 of the GERC (Electricity Supply Code and Related Matters) Regulations, 2015 to give LT consumers the option of the higher threshold (p1). The Commission states that it intends to amend the Supply Code, 2015, and that the 2005 Miscellaneous Charges Regulations must be amended consequentially to give effect to that Supply Code amendment (p1).

Standard name
Recovery of Expenditure and Miscellaneous Charges, Electricity Supply Code
Primary topics
New connections and load changes, Connection and miscellaneous charges

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document