GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
Dra3 Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fi3h Amendment) RegulaGons, 2025
Explanatory memorandum to a draftDated 26 Sep 2025
Draft
The draft has since been finalised as the Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025.
Explanatory memorandum to the Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Gujarat Electricity Regulatory Commission's explanatory memorandum for the draft Fifth Amendment to the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations, 2005 (p1). It is a consultation-stage paper: it recites the 2005 Regulations, reproduces the existing clause 8.2(F) on charges for miscellaneous work – charges at actual cost of labour and materials plus 15% for overheads – and explains why the amendment is proposed (p1).
The trigger is the Commission's order dated 03.12.2024 in Petition No. 2289 of 2023, filed by DGVCL and others, which approved a supervision charge of 2.5% in place of 15% on estimates for shifting the licensee's infrastructure for National Highway, State Highway and other Central and State Government infrastructure projects, following the Ministry of Power's Standard Operating Procedure (p1). Paragraphs 7.18 and 7.19 of that order, quoted here, direct that Regulations 6 and 8.2 be amended and that a draft be issued with public notice inviting comments under Section 181 of the Electricity Act, 2003 (p1–2).
The operative part is the proposed redraft of clause F, which repeats the existing miscellaneous-work charge language and adds a proviso: Infrastructure Developers must pay supervision/overhead charges at the rates set out in a table to the owner of the transmission or distribution line whose infrastructure is shifted (p2).
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.