GERC · Gujarat Electricity Regulatory Commission

Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft

Dra3 Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fi3h Amendment) RegulaGons, 2025

Explanatory memorandum to a draftDated 26 Sep 2025

Explanatory memorandum to the Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Gujarat Electricity Regulatory Commission's explanatory memorandum for the draft Fifth Amendment to the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations, 2005 (p1). It is a consultation-stage paper: it recites the 2005 Regulations, reproduces the existing clause 8.2(F) on charges for miscellaneous work – charges at actual cost of labour and materials plus 15% for overheads – and explains why the amendment is proposed (p1).

The trigger is the Commission's order dated 03.12.2024 in Petition No. 2289 of 2023, filed by DGVCL and others, which approved a supervision charge of 2.5% in place of 15% on estimates for shifting the licensee's infrastructure for National Highway, State Highway and other Central and State Government infrastructure projects, following the Ministry of Power's Standard Operating Procedure (p1). Paragraphs 7.18 and 7.19 of that order, quoted here, direct that Regulations 6 and 8.2 be amended and that a draft be issued with public notice inviting comments under Section 181 of the Electricity Act, 2003 (p1–2).

The operative part is the proposed redraft of clause F, which repeats the existing miscellaneous-work charge language and adds a proviso: Infrastructure Developers must pay supervision/overhead charges at the rates set out in a table to the owner of the transmission or distribution line whose infrastructure is shifted (p2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.