GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Second Amendment) Regulations, 2020
AmendmentDated 25 Jun 2020Published in the Gazette 26 Jun 2020Notification No. 3 of 2020 dated 25/06/2020
Amends the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page amendment by the Gujarat Electricity Regulatory Commission to its 2005 regulations on a distribution licensee's power to recover expenditure for providing supply and other miscellaneous charges. Issued as Notification No. 3 of 2020 and dated 25 June 2020, it was published in the Gujarat Government Gazette Extraordinary on 26 June 2020 (p1–2) and takes effect from that publication date (p1).
The operative change is confined to Chapter V of the principal Regulations. It adds two sub-clauses to clause 5 (p1–2). The first lets a distribution licensee charge prospective applicants for new demand or load extension at HT level on a Rs per kVA/kW basis, and lets it dispense with preparing detailed individual cost estimates where technical or other constraints justify that; the licensee must submit the necessary details to the Commission, which may scrutinise them, call for further details, or issue suo moto directions (p1–2). The second requires the methodology the licensee adopts to have the Commission's approval (p2).
The document is short and self-contained: it contains no schedules, no forms and no separate statement of reasons, and it states no savings or transitional provision for charges already levied.
Read with this
The regulation
Amendments and corrections
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.