GERC · Gujarat Electricity Regulatory Commission

Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Second Amendment) Regulations, 2020

AmendmentDated 25 Jun 2020Published in the Gazette 26 Jun 2020Notification No. 3 of 2020 dated 25/06/2020

Amends the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page amendment by the Gujarat Electricity Regulatory Commission to its 2005 regulations on a distribution licensee's power to recover expenditure for providing supply and other miscellaneous charges. Issued as Notification No. 3 of 2020 and dated 25 June 2020, it was published in the Gujarat Government Gazette Extraordinary on 26 June 2020 (p1–2) and takes effect from that publication date (p1).

The operative change is confined to Chapter V of the principal Regulations. It adds two sub-clauses to clause 5 (p1–2). The first lets a distribution licensee charge prospective applicants for new demand or load extension at HT level on a Rs per kVA/kW basis, and lets it dispense with preparing detailed individual cost estimates where technical or other constraints justify that; the licensee must submit the necessary details to the Commission, which may scrutinise them, call for further details, or issue suo moto directions (p1–2). The second requires the methodology the licensee adopts to have the Commission's approval (p2).

The document is short and self-contained: it contains no schedules, no forms and no separate statement of reasons, and it states no savings or transitional provision for charges already levied.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document