GERC · Gujarat Electricity Regulatory Commission
Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fourth Amendment) Regulations, 2024
Statement of reasonsDated 23 Sep 2024
The commission's reasons for the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005 or one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is GERC's Statement of Reasons for the Fourth Amendment to its 2005 regulations governing a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges (p1). The amended regulation text is not reproduced: the document records why the amendment was made, the public consultation, the objections received, and closes by directing publication of the amendment in the Official Gazette (p5).
Background (pp1–2): consumer organisations asked the Commission to raise the LT connection threshold from 100 kVA/kW to 150 kVA/kW. The Ministry of Power wrote about easing release of new connections, citing Rule 13 of the Electricity (Rights of Consumer) Rules, 2020, under which connection charges up to 150 kW are fixed on load and category rather than by site inspection. The ESCRP, in its 26th Meeting, recommended amending Clause 3.2 of the GERC Supply Code, 2015. GERC accordingly amended the Supply Code (Fourth Amendment) 2024 and then found a consequential amendment necessary in the 2005 miscellaneous-charges regulations.
Consultation (pp2–3): public notice on 01.09.2024 in two Gujarati newspapers and one English newspaper; comments closed 17.09.2024; three stakeholders responded; a hearing was held on 19.09.2024 with six participants.
Objections and findings (pp3–5): RCCI objected to HT voltage-level charges being recovered from LT industrial consumers and asked that LT industrial consumers be included; GCCI objected to the financial burden on small/MSME LT consumers, sought withdrawal, and proposed 'All LT consumers' instead of 'LT Commercial consumers'. The Commission rejected both, stating that no change in the recovery method is being made and no new charges are being approved, and that the substitution of the existing commercial-consumer entry with 'd. LT Commercial consumers' only gives effect to the Supply Code amendment raising the LT threshold from 100 kVA/kW to 150 kVA/kW. No change was made to the draft.
Paragraph 4 directs gazette publication (p5); no Gazette date is printed.
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.