Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fourth Amendment) Regulations, 2024

Statement of reasonsDated 23 Sep 2024

The commission's reasons for the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is GERC's Statement of Reasons for the Fourth Amendment to its 2005 regulations governing a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges (p1). The amended regulation text is not reproduced: the document records why the amendment was made, the public consultation, the objections received, and closes by directing publication of the amendment in the Official Gazette (p5).

Background (pp1–2): consumer organisations asked the Commission to raise the LT connection threshold from 100 kVA/kW to 150 kVA/kW. The Ministry of Power wrote about easing release of new connections, citing Rule 13 of the Electricity (Rights of Consumer) Rules, 2020, under which connection charges up to 150 kW are fixed on load and category rather than by site inspection. The ESCRP, in its 26th Meeting, recommended amending Clause 3.2 of the GERC Supply Code, 2015. GERC accordingly amended the Supply Code (Fourth Amendment) 2024 and then found a consequential amendment necessary in the 2005 miscellaneous-charges regulations.

Consultation (pp2–3): public notice on 01.09.2024 in two Gujarati newspapers and one English newspaper; comments closed 17.09.2024; three stakeholders responded; a hearing was held on 19.09.2024 with six participants.

Objections and findings (pp3–5): RCCI objected to HT voltage-level charges being recovered from LT industrial consumers and asked that LT industrial consumers be included; GCCI objected to the financial burden on small/MSME LT consumers, sought withdrawal, and proposed 'All LT consumers' instead of 'LT Commercial consumers'. The Commission rejected both, stating that no change in the recovery method is being made and no new charges are being approved, and that the substitution of the existing commercial-consumer entry with 'd. LT Commercial consumers' only gives effect to the Supply Code amendment raising the LT threshold from 100 kVA/kW to 150 kVA/kW. No change was made to the draft.

Paragraph 4 directs gazette publication (p5); no Gazette date is printed.

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Consumer representation

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document