Skip to content

GERC · Gujarat Electricity Regulatory Commission

Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022

Draft amendmentDated 19 Feb 2022

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This draft amendment would make three changes to GERC's 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges (p1–2). Clause 1 names the instrument, extends it to the whole of Gujarat and makes it effective from the date of notification in the Official Gazette (p1).

Clause 2 rewrites the definition of 'Temporary Service' in Chapter II, recasting temporary supply as an initial period not exceeding twelve months, reviewable for further extension along the lines of the classifications of installation used for permanent supply (p1).

Clause 3 amends Chapter VII in two places. The substituted clause 7(vi) requires any excess amount to be refunded by account-payee cheque or electronic mode within 30 days of energisation of the connection, with interest at the prevailing Late Payment Surcharge rate if that deadline is missed, an item-wise bill comparing estimated and actual expenditure with variances, and a response to further information requests within 10 days (p2). The substituted clause 7(vii) requires the applicant or consumer to pay expenditure above the amount deposited within thirty days of demand, failing which it is debited to the next electricity bill (p2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges, New connections and load changes, Billing and payment

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document