GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Third Amendment) Regulations, 2022
Draft amendmentDated 19 Feb 2022
Draft
A proposal that has since been finalised as the Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This draft amendment would make three changes to GERC's 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges (p1–2). Clause 1 names the instrument, extends it to the whole of Gujarat and makes it effective from the date of notification in the Official Gazette (p1).
Clause 2 rewrites the definition of 'Temporary Service' in Chapter II, recasting temporary supply as an initial period not exceeding twelve months, reviewable for further extension along the lines of the classifications of installation used for permanent supply (p1).
Clause 3 amends Chapter VII in two places. The substituted clause 7(vi) requires any excess amount to be refunded by account-payee cheque or electronic mode within 30 days of energisation of the connection, with interest at the prevailing Late Payment Surcharge rate if that deadline is missed, an item-wise bill comparing estimated and actual expenditure with variances, and a response to further information requests within 10 days (p2). The substituted clause 7(vii) requires the applicant or consumer to pay expenditure above the amount deposited within thirty days of demand, failing which it is debited to the next electricity bill (p2).
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.