GERC · Gujarat Electricity Regulatory Commission
Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Second Amendment) Regulations, 2019
Draft amendmentDated 18 Dec 2019
Draft
A proposal that has since been finalised as the Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a two-page draft amendment published by the Gujarat Electricity Regulatory Commission, proposing the Second Amendment to the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations, 2005, referred to as "the principal Regulations" (p1). It inserts two new sub-clauses, 5(iii) and 5(iv), into Chapter V of the principal Regulations (p1–2).
The first new sub-clause would allow a Distribution Licensee to recover charges for seeking new demand or load extension at HT level on a Rs. per kVA/kW basis from prospective applicants, and to dispense with detailed individual estimates where technical or other constraints and parameters justify it. Supporting details must be submitted to the Commission, which may accept them after detailed scrutiny, call for further details, or issue suo moto directions (p1–2). The second sub-clause would require the methodology adopted by Distribution Licensees to have the Commission's approval (p2).
The draft is to come into force on publication in the Official Gazette. It is signed by the Secretary at Gandhinagar on 18/12/2019, with the notification number left blank (p1–2).
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.