Licensee's Power to Recover Expenditure Regulations, 2005 — First Amendment, 2009 — Draft

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing supply and other Miscellaneous Charges)(First Amendment) Regulations, 2009

Draft amendmentDated 16 Sep 2009GERC/TECH-II/ dated 16/9/2009

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft notification from the Gujarat Electricity Regulatory Commission proposing the First Amendment to the GERC (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) Regulations, 2005 (p1). It is made under s.181(2)(u) read with ss.45 and 46 of the Electricity Act, 2003 (p1).

Clause 1 gives the short title — the First Amendment Regulations, 2009 — and states that they come into force on publication in the Gazette; no Gazette date is printed (p1).

Clause 2 substitutes regulation 4.2(i) in full. The replacement text sets out how a distribution licensee must estimate the cost of electrical plant — distribution transformer together with switchgear — when extending supply to applicants for low-tension connections: a cost-per-kVA figure derived from the erection cost and the transformer's rated capacity, applied to the applicant's contracted load in kVA to arrive at the amount payable (p1–2). Where the capacity of an existing transformer is augmented, the differential cost between the existing and the new plant becomes the basis for calculating pro-rata charges, and the licensee must keep estimating amounts payable by subsequent applicants on that basis until the full cost of the transformer is recovered (p2). In all cases the cost estimate must rest on the licensee's latest published cost data (p2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document