GERC · Gujarat Electricity Regulatory Commission
Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025
Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fifth Amendment) Regulations, 2025
AmendmentDated 14 Oct 2025Published in the Gazette 14 Oct 2025Notification No. 09 of 2025 dated 14/10/2025
Amends the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a short, single-clause amendment issued by the Gujarat Electricity Regulatory Commission and published as an Extraordinary Gazette notification in Part IV-C (p1). It amends the Commission's 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges — cited throughout as the Principal Regulations (p1). The notification carries two numbers: Notification No. 09 of 2025 and the file reference GERC/2025/09/Tech/2092 (p1).
Clause 1 gives the short title, extends the amendment to the whole of Gujarat, and brings it into force from the date of publication in the Official Gazette — 14 October 2025 as printed (p1).
The only substantive change is the substitution of Clause 8.2(F) in Chapter VIII of the Principal Regulations, under the heading "Charges for Miscellaneous Work" (p2). The substituted clause sets the basis on which a supplier charges for work done for a consumer that is not covered elsewhere in the schedule — work billed in advance at actual cost of labour and materials plus an overhead margin, whether done directly for the consumer or as agency work on the consumer's behalf, with estimates submitted as needed (p2). It then adds a new proviso requiring an Infrastructure Developer to pay supervision/overhead charges to the owner of the transmission or distribution line.
For an analyst, this matters mainly for distribution and transmission licensees, consumers paying miscellaneous charges, and infrastructure developers connected to licensee lines — but the operative rates for the developer proviso must be obtained from the Gazette original (p2). The notification is signed by the Secretary, GERC at Gandhinagar (p2).
Read with this
The regulation
Amendments and corrections
- Dated 25 Jun 2020Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges (Second Amendment) Regulations, 2020
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges (Third Amendment) Regulations, 2023
- Dated 23 Sep 2024Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024
Commencement notices and reasons
- Dated 5 Dec 2023Licensee's Power to Recover Expenditure and Miscellaneous Charges, 2005 — Third Amendment, 2023 — Statement of Reasons
- Dated 23 Sep 2024Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fourth Amendment, 2024 — Statement of Reasons
- Dated 14 Oct 2025Recovery of Expenditure and Miscellaneous Charges Regulations, 2005 — Fifth Amendment, 2025 — Statement of Reasons
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 31 Oct 2010Licensee's Power to Recover Expenditure Regulations, 2005 — Amendment — Statement of Reasons — Draft
- Dated 16 Feb 2014Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges (Second Amendment) Regulations, 2019 — Explanatory Note — Draft
- Dated 18 Dec 2019Licensee's Power to Recover Expenditure (Supply and Miscellaneous Charges) Regulations — Second Amendment, 2019 — Draft
- Dated 19 Feb 2022Licensee's Power to Recover Expenditure in providing Supply and other Miscellaneous Charges (Third Amendment) Regulations, 2022 — Draft
- Dated 31 Aug 2024Licensee's Power to Recover Expenditure for Supply and Miscellaneous Charges, 2005 — Fourth Amendment, 2024 — Draft
- Dated 31 Aug 2024Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fourth Amendment) Regulations, 2024 — Explanatory Note — Draft
- Dated 26 Sep 2025Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Draft
- Dated 26 Sep 2025Explanatory memorandum: Licensee's Power to Recover Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025 — Explanatory Memorandum — Draft
7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.
Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.