Skip to content

GERC · Gujarat Electricity Regulatory Commission

Recovery of Expenditure and Miscellaneous Charges (Fifth Amendment) Regulations, 2025

Gujarat Electricity Regulatory Commission (Licensee's Power to Recover Expenditure incurred in providing Supply and other Miscellaneous Charges) (Fifth Amendment) Regulations, 2025

AmendmentDated 14 Oct 2025Published in the Gazette 14 Oct 2025Notification No. 09 of 2025 dated 14/10/2025

Amends the Licensee Power to Recover Expenditure in Providing Supply and Other Miscellaneous Charges Regulations, 2005.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on gercin.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short, single-clause amendment issued by the Gujarat Electricity Regulatory Commission and published as an Extraordinary Gazette notification in Part IV-C (p1). It amends the Commission's 2005 regulations on a licensee's power to recover expenditure incurred in providing supply and other miscellaneous charges — cited throughout as the Principal Regulations (p1). The notification carries two numbers: Notification No. 09 of 2025 and the file reference GERC/2025/09/Tech/2092 (p1).

Clause 1 gives the short title, extends the amendment to the whole of Gujarat, and brings it into force from the date of publication in the Official Gazette — 14 October 2025 as printed (p1).

The only substantive change is the substitution of Clause 8.2(F) in Chapter VIII of the Principal Regulations, under the heading "Charges for Miscellaneous Work" (p2). The substituted clause sets the basis on which a supplier charges for work done for a consumer that is not covered elsewhere in the schedule — work billed in advance at actual cost of labour and materials plus an overhead margin, whether done directly for the consumer or as agency work on the consumer's behalf, with estimates submitted as needed (p2). It then adds a new proviso requiring an Infrastructure Developer to pay supervision/overhead charges to the owner of the transmission or distribution line.

For an analyst, this matters mainly for distribution and transmission licensees, consumers paying miscellaneous charges, and infrastructure developers connected to licensee lines — but the operative rates for the developer proviso must be obtained from the Gazette original (p2). The notification is signed by the Secretary, GERC at Gandhinagar (p2).

Standard name
Recovery of Expenditure and Miscellaneous Charges
Primary topics
Connection and miscellaneous charges

Read with this

Proposed changes (drafts with no final yet)

7 more documents belong here and are not on Voltaic: 5 copies in another language and 2 drafts or notices on a draft.

Voltaic last read GERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 23 Nov 2026. A document GERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on gercin.org ↗

Report an issue with this document