Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
Showing the best matches for “energy storage obligation”: 14 documents. There may be more. Add words, or choose a regulator or a type, to narrow the search.
The state and topic filters do not apply to a word search yet; the regulator, document type and year filters do.
Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations 2021 — Sixth Amendment, 2026
- SIXTH AMENDMENT TO MADHYA PRADESH ELECTRICITY REGULATORY … › 2. Amendment to Regulation 3 of the Principal Regulations.… 4 --> Financial Year Storage (on Energy basis) 2026-27 2.5% 2027-28 3.0% 2028-29 3.5% 2029-30 4.0% …
- … 2 --> 3.1.12 (Promising Commercially Viable Energy Technologies) (Battery Energy Storage Systems-BESS) (Pumped Storage Plant-PSP) (Commissioning)/ (Energy Storage Obligation) Bhopal the 4 August 2026 No.1349/MPERC/2026. …
3 matching passages in this document
Co-Generation and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — First Amendment, 2023
- 2. Amendment to Regulation 2 of the Principal Regulations › 3.1 Regulation 3.1 of the Principal Regulations shall be …3.1.11 The Energy Storage Obligation in 3.1.10 above shall be calculated in energy terms as a percentage of total procurement of electricity and shall be treated as fulfilled only when at least 85% of the total energy stored in the Energy …
- 2. Amendment to Regulation 2 of the Principal Regulations › 3.1 Regulation 3.1 of the Principal Regulations shall be …… commissioned after 31 March 2022 and the wind energy procured over and above 7% from WPPs commissioned till 31 March 22. (b) HPO shall be met only by energy procured from Hydro Power Projects [including Pumped Storage Projects (PSPs) …
3 matching passages in this document
Formats for Resource Adequacy Regulations
- … up to fulfill RPO MW RPO Total RPO % RPO MU RPO MW Energy Storage Obligation ESO % Energy to be procured through Storage MU Energy to be procured through Storage MW
- … 1 Energy Sale MUs (Consumer Category wise as per Retail Supply Tariff Order) 2 Total Energy Sale (MU)- (Cumulative of all consumer categories) 3 YoY growth rate for total energy Sales (%) 4 Distribution losses in % 5 Distribution losses …
3 matching passages in this document
Cogeneration and Generation of Electricity from Renewable Sources of Energy Regulations, 2021 — Revision-II
6 amendments on Voltaic
- MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION … › 2. Definitions… 'Renewable Energy Sources' means renewable source of energy approved by the MNRE, such as water, wind, sunlight, biomass, bagasse, municipal solid waste and other such sources …
- PART B › 13. Certificates under the Regulations of the Central …… Commission (Terms and Conditions for recognition and issue of Renewable Energy Certificate for Renewable Energy Generation) Regulations, 2010, as the valid instrument for full or partial discharge of the mandatory obligations set out in …
3 matching passages in this document
Grid Interactive Renewable Energy Systems and Related Matters Regulations [Revision-II], 2024
1 amendment on Voltaic
Framework for Resource Adequacy Regulations, 2024
- Chapter 4 › 8. Preparation of Generation Resource Planning… 11 --> j) Renewable Purchase Obligation (RPO) including Energy Storage Obligation targets, etc.; k) Constraints such as penalties for unmet demand, forced outages, and system emission limits as defined in State Grid Code and Indian …
- ANNEXURE -I › Methodology of Preparation of Resource Adequacy Plan with …Fulfilment of Renewable Purchase Obligation shall be considered as one of the objectives of Resource Adequacy. Technology options like renewable energy generation for round the clock energy supply backed with storage (Battery and PSP), …
2 matching passages in this document
Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
Cogeneration and Generation of Electricity from Renewable Sources of Energy (Revision-II) Regulations, 2021 — Fifth Amendment, 2026
Ancillary Services Regulations, 2024
- MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (ANCILLARY … › 3. Definitions and Interpretations(12) "Energy Storage" in relation to the electricity system, means a facility where electrical energy is converted into any other form of energy which can be stored, and subsequently reconverted into electrical energy;
- MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (ANCILLARY … › 7. Eligibility for an SRAS Provider… for an SRAS Provider A generating station or an entity having energy storage resources or an entity capable of providing demand response, on a standalone or aggregated basis, connected to the intra-State transmission system, shall be …
2 matching passages in this document
Ancillary Services Regulations, 2024
- MADHYA PRADESH ELECTRICITY REGULATORY COMMISSION (ANCILLARY … › 3. Definitions and Interpretations(12) "Energy Storage" in relation to the electricity system, means a facility where electrical energy is converted into any other form of energy which can be stored, and subsequently reconverted into electrical energy;
- Secondary Reserve Ancillary Service (SRAS) › 7. Eligibility for an SRAS Provider… for an SRAS Provider A generating station or an entity having energy storage resources or an entity capable of providing demand response, on a standalone or aggregated basis, connected to the intra-State transmission system, shall be …
2 matching passages in this document
Conventional Fuel Based Captive Power Plants Regulations, 2009 — First Amendment, 2023
Madhya Pradesh Electricity Grid Code (Revision-III), 2024
1 amendment on Voltaic
Generation Tariff Regulations, 2024
Generation Tariff Regulations, 2024