APERC · Andhra Pradesh Electricity Regulatory Commission
Regulation No 03 of 2026 — Second Amendment
Regulation No 03 of 2026 Second Amendment
AmendmentDated 8 May 2026Published in the Gazette 21 May 2026Lr. No. APERC/Secy/F.No. S-19(Vol-IV)/D.No.278 dated 08-05-2026
Amends the Regulation 6 of 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025). It is issued by APERC as Regulation No. 03 of 2026 and published in the Andhra Pradesh Gazette on 21 May 2026 (p1). It comes into force on the date of Gazette publication (p2). The introduction records the Principal Regulation, the First Amendment (Regulation No. 12 of 2025), stakeholder representations seeking removal of the single interconnection point condition for renewable hybrid projects, a draft amendment and public notice dated 19.02.2026, and the Commission's order dated 08-05-2026 disposing of comments (p1–2).
The operative text substitutes five clauses of the Principal Regulation. Clause 2(1)(z) and Clause 2(1)(aa) are amended to define renewable energy with storage and renewable hybrid energy projects as being connected at the same or different interconnection point(s) (p3). Clause 4(f) is substituted to set the capacity-ratio criterion for hybrid projects — one source at least 25% of the rated power capacity of the other — and to require metering at the interconnection point(s), with a minimum CUF of 40% for each 1 MW of contracted Wind-Solar Hybrid Project (p3). Clause 4(k) updates the description of renewable energy with storage projects (p3). Clause 67 is substituted to provide for project-specific CUF determination by the Commission, considering the proportion of each source and the applicable CUF, and restates the 25% and 40% thresholds (p3–4).
The amendment is prospective and does not alter the rest of the Principal Regulation except through the substituted clauses.
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.