APERC · Andhra Pradesh Electricity Regulatory Commission

Regulation No 03 of 2026 — Second Amendment

Regulation No 03 of 2026 Second Amendment

AmendmentDated 8 May 2026Published in the Gazette 21 May 2026Lr. No. APERC/Secy/F.No. S-19(Vol-IV)/D.No.278 dated 08-05-2026

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025). It is issued by APERC as Regulation No. 03 of 2026 and published in the Andhra Pradesh Gazette on 21 May 2026 (p1). It comes into force on the date of Gazette publication (p2). The introduction records the Principal Regulation, the First Amendment (Regulation No. 12 of 2025), stakeholder representations seeking removal of the single interconnection point condition for renewable hybrid projects, a draft amendment and public notice dated 19.02.2026, and the Commission's order dated 08-05-2026 disposing of comments (p1–2).

The operative text substitutes five clauses of the Principal Regulation. Clause 2(1)(z) and Clause 2(1)(aa) are amended to define renewable energy with storage and renewable hybrid energy projects as being connected at the same or different interconnection point(s) (p3). Clause 4(f) is substituted to set the capacity-ratio criterion for hybrid projects — one source at least 25% of the rated power capacity of the other — and to require metering at the interconnection point(s), with a minimum CUF of 40% for each 1 MW of contracted Wind-Solar Hybrid Project (p3). Clause 4(k) updates the description of renewable energy with storage projects (p3). Clause 67 is substituted to provide for project-specific CUF determination by the Commission, considering the proportion of each source and the applicable CUF, and restates the 25% and 40% thresholds (p3–4).

The amendment is prospective and does not alter the rest of the Principal Regulation except through the substituted clauses.

Standard name
Renewable Energy Tariff Regulations

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document