Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025)
AmendmentDated 8 May 2026Regulation 03 of 2026 dated 08.05.2026
Amends the Regulation 6 of 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Andhra Pradesh Electricity Regulatory Commission's combined statement of reasons, order and amendment regulation granting flexibility of interconnection to renewable hybrid energy projects. Pages 1–6 are the Statement of Reasons/Order dated 08.05.2026, signed by Sri P.V.R. Reddy, Member & Chairman i/c, at Kurnool. It recites the background: the Principal Regulation on RE tariff determination (Regulation No. 6 of 2025), gazetted on 12.09.2025; the First Amendment (Regulation No. 12 of 2025), gazetted in the AP Extraordinary Gazette on 05.12.2025; and the Draft Second Amendment issued with a Public Notice dated 19.02.2026 (p1).
The order takes five draft amendments one by one and, for each, sets out stakeholder views and the Commission's decision. The amendments substitute clause 2(1)(z) (renewable energy with storage project) and clause 2(1)(aa) (renewable hybrid energy project) of the Principal Regulation so that components may sit at the same or different interconnection point(s); substitute clause 4(f) to define a hybrid project by a rated-capacity proportion between the two resources, with a proviso that injection and metering happen at the interconnection point(s) and a minimum CUF proviso for contracted wind-solar hybrid projects; substitute clause 4(k) on storage; and substitute clause 67 so that the Commission determines only project-specific CUF, with a minimum CUF measured at the injection point(s) (pp2–3, 5, 9–10).
On objections, developer-side bodies (DiSPA, NSEFI, Torrent Green Energy) supported multi-location hybrids and asked for enabling treatment of connectivity, scheduling, deviation settlement and transmission/wheeling charges; consumer-side objectors and the Indian Wind Power Association opposed multi-location hybrids and the CUF floor. The Commission accepted the draft, held that connectivity, scheduling, deviation settlement and charges are already addressed in amendments to the GEOA Regulations, and declined to reopen CUF on the ground that it was finalised earlier after public consultation (pp3–6).
Annexure I lists the seven objectors (p7). Annexure II carries the final regulation, Regulation 03 of 2026, whose clause 1 gives the short title, extent to Andhra Pradesh and commencement on Gazette publication (pp8–10).
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.