APERC · Andhra Pradesh Electricity Regulatory Commission

Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order

Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025)

AmendmentDated 8 May 2026Regulation 03 of 2026 dated 08.05.2026

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Andhra Pradesh Electricity Regulatory Commission's combined statement of reasons, order and amendment regulation granting flexibility of interconnection to renewable hybrid energy projects. Pages 1–6 are the Statement of Reasons/Order dated 08.05.2026, signed by Sri P.V.R. Reddy, Member & Chairman i/c, at Kurnool. It recites the background: the Principal Regulation on RE tariff determination (Regulation No. 6 of 2025), gazetted on 12.09.2025; the First Amendment (Regulation No. 12 of 2025), gazetted in the AP Extraordinary Gazette on 05.12.2025; and the Draft Second Amendment issued with a Public Notice dated 19.02.2026 (p1).

The order takes five draft amendments one by one and, for each, sets out stakeholder views and the Commission's decision. The amendments substitute clause 2(1)(z) (renewable energy with storage project) and clause 2(1)(aa) (renewable hybrid energy project) of the Principal Regulation so that components may sit at the same or different interconnection point(s); substitute clause 4(f) to define a hybrid project by a rated-capacity proportion between the two resources, with a proviso that injection and metering happen at the interconnection point(s) and a minimum CUF proviso for contracted wind-solar hybrid projects; substitute clause 4(k) on storage; and substitute clause 67 so that the Commission determines only project-specific CUF, with a minimum CUF measured at the injection point(s) (pp2–3, 5, 9–10).

On objections, developer-side bodies (DiSPA, NSEFI, Torrent Green Energy) supported multi-location hybrids and asked for enabling treatment of connectivity, scheduling, deviation settlement and transmission/wheeling charges; consumer-side objectors and the Indian Wind Power Association opposed multi-location hybrids and the CUF floor. The Commission accepted the draft, held that connectivity, scheduling, deviation settlement and charges are already addressed in amendments to the GEOA Regulations, and declined to reopen CUF on the ground that it was finalised earlier after public consultation (pp3–6).

Annexure I lists the seven objectors (p7). Annexure II carries the final regulation, Regulation 03 of 2026, whose clause 1 gives the short title, extent to Andhra Pradesh and commencement on Gazette publication (pp8–10).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Energy storage deployment

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.