APERC · Andhra Pradesh Electricity Regulatory Commission
Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
Regulation 7 of 2025 Sixth Amendment
AmendmentDated 9 Oct 2025Published in the Gazette 9 Oct 2025No.631 dated OCTOBER 9, 2025
Amends the Regulation 6 of 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Andhra Pradesh Electricity Regulatory Commission's Sixth Amendment to its Licensees' Standards of Performance Regulation, 2004, issued as Regulation No. 07 of 2025 and gazetted on 9 October 2025. It is a short, two-clause amendment that rewrites the consumer-service timelines distribution licensees must meet when a consumer's meter is burnt out.
Pages 1–2 are recitals. They trace the Principal Regulation of 2004 and its five earlier amendments, the 2014 APERC (Adoption) Regulation by which the post-bifurcation Commission adopted the 2004 instrument, and the Government of India's Electricity (Rights of Consumers) Rules, 2020, which the Commission says it is aligning with. The recitals record that a draft was posted for stakeholder comment on 12 September 2025. Clause 1 gives the short title, extends the regulation to the whole State, and brings it into force from Gazette publication.
Clause 2 (p3) substitutes sub-paragraph 3.2 of Paragraph III of Schedule I. It restates the licensee's obligation to replace burnt meters at its own cost within twenty-four hours in urban areas and seventy-two hours in rural areas, and separates the case where burning is attributable to the licensee from the case where it is attributable to the consumer — in the latter, the clock runs from payment of the meter cost and from corrective action.
Clause 3 (p3) substitutes items VII (ii) and (iii) of Schedule II, the compensation table for meter complaints, restating the time standards and the per-day compensation payable for default. The document substitutes text rather than creating new obligations, and sets no end date.
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.