Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons

First Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025)

AmendmentDated 5 Dec 2025Regulation 12 of 2025 dated 05.12.2025

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Andhra Pradesh Electricity Regulatory Commission's reasoned order and the resulting First Amendment to its renewable-energy tariff regulation, issued at Kurnool on 5 December 2025 (p1, p7). The regulation being amended is the APERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 — Regulation No. 6 of 2025 — gazetted on 12.09.2025 (p1).

Pages 1–4 carry the Statement of Reasons/Order. It records that, after reviewing the operating performance of small hydro stations in the State, the Commission proposed to revise the minimum normative CUF for such stations, and hosted the draft amendment and a public notice on its website on 18.11.2025 under s.181(3) of the Electricity Act 2003 with the Electricity (Procedure for Previous Publication) Rules, 2005 (p1). Three stakeholders, all small hydro developers, responded and supported the draft (p2, p5).

The Commission accepts the substance of the draft and substitutes Clause 27 of the Principal Regulation: CUF is to be project-specific subject to a floor of 30%, and a new proviso — expressed as notwithstanding clause 10 of the Regulation — provides that where a small hydro project generates energy above the CUF/PLF in a given year, that excess energy earns the tariff applicable for that year (p2–3, p7). The Commission declines a second set of requests to drop PPA-derived annual operating hour caps and monthly delivered energy limits, holding that the Regulation contains no such restriction and that these are contractual matters for the parties rather than grounds for amendment (p3).

Annexure I lists the three objectors (p5); Annexure II (p6–7) sets out the finalised amendment with its short title, extent to Andhra Pradesh, and commencement on Gazette publication — the Gazette date itself is not printed.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document