Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

1st Amendment through Reg No 12 of 2025

AmendmentDated 5 Dec 2025Published in the Gazette 8 Dec 2025

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short gazette amendment by the Andhra Pradesh Electricity Regulatory Commission that changes a single clause of the Commission's 2025 renewable-energy tariff regulation. It was signed at Kurnool on 05.12.2025, numbered Regulation 12 of 2025, and published in the Andhra Pradesh Gazette (Part II Extraordinary, No. 719, Amaravati, 8 December 2025) (p1).

The introduction explains the trigger: after notifying the Principal Regulation — the APERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025), gazetted 12.09.2025 — the Commission reviewed the operating performance of small hydro generating stations in the State and issued a draft amendment proposing to revise the minimum normative Capacity Utilisation Factor (CUF) for such stations to 30%. The draft and a public notice under s.181(3) of the Electricity Act, 2003 read with the Electricity (Procedure for Previous Publication) Rules, 2005 went on the Commission's website on 18.11.2025; stakeholder suggestions were considered in an Order dated 05.12.2025 (p1–2).

Clause 1 gives the short title, extends the amendment to the whole State, and brings it into force on gazette publication (p2).

Clause 2 substitutes clause 27 of the Principal Regulation in full: the CUF is to be project-specific and not less than 30%, and where a small hydro project generates above its CUF or plant load factor in a given year, the excess energy is paid at the tariff applicable for that year, notwithstanding clause 10 (p2).

Standard name
Renewable Energy Tariff Regulations

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document