APERC · Andhra Pradesh Electricity Regulatory Commission
1st Amendment through Reg No 12 of 2025
AmendmentDated 5 Dec 2025Published in the Gazette 8 Dec 2025
Amends the Regulation 6 of 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A short gazette amendment by the Andhra Pradesh Electricity Regulatory Commission that changes a single clause of the Commission's 2025 renewable-energy tariff regulation. It was signed at Kurnool on 05.12.2025, numbered Regulation 12 of 2025, and published in the Andhra Pradesh Gazette (Part II Extraordinary, No. 719, Amaravati, 8 December 2025) (p1).
The introduction explains the trigger: after notifying the Principal Regulation — the APERC (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025), gazetted 12.09.2025 — the Commission reviewed the operating performance of small hydro generating stations in the State and issued a draft amendment proposing to revise the minimum normative Capacity Utilisation Factor (CUF) for such stations to 30%. The draft and a public notice under s.181(3) of the Electricity Act, 2003 read with the Electricity (Procedure for Previous Publication) Rules, 2005 went on the Commission's website on 18.11.2025; stakeholder suggestions were considered in an Order dated 05.12.2025 (p1–2).
Clause 1 gives the short title, extends the amendment to the whole State, and brings it into force on gazette publication (p2).
Clause 2 substitutes clause 27 of the Principal Regulation in full: the CUF is to be project-specific and not less than 30%, and where a small hydro project generates above its CUF or plant load factor in a given year, the excess energy is paid at the tariff applicable for that year, notwithstanding clause 10 (p2).
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.