Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Regulation 8 of 2025 — Second Amendment

Regulation 8 of 2025 Second Amendment

AmendmentDated 4 Dec 2025Published in the Gazette 8 Dec 2025No.715 dated DECEMBER 8, 2025

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Andhra Pradesh Electricity Regulatory Commission's Second Amendment to the Terms and Conditions of Open Access Regulation, 2005, issued as Regulation No. 08 of 2025 and published in the Andhra Pradesh Extraordinary Gazette on 8 December 2025 (p1). It is a short instrument that changes two clauses of the Principal Regulation, after two rounds of public consultation on drafts published on 26 March 2025 and 19 August 2025 (p2).

The Introduction (pp1–2) sets out the lineage: the 2005 Principal Regulation, its adoption by the newly constituted APERC for the residual State through the 2014 Adaptation Regulation, and the first amendment of 2016. It then records that the Government of Andhra Pradesh, invoking Section 108 of the Electricity Act 2003, asked the Commission to insert a proviso tying grid connectivity for Clean Energy Projects to the progress and recommendation of the State Nodal Agency, as contemplated in GO.Ms.No.37 dated 30.10.2024, in order to implement the Integrated Clean Energy Policy, 2024.

Clause 1 (pp2–3) gives the title, extends the Regulation to the whole of Andhra Pradesh and brings it into force on gazette publication. Clause 2 (p3) adds the proviso to Clause 9.2, making grid connectivity for such Clean Energy Projects dependent on the State Nodal Agency's progress and recommendation and on compliance with Commission-issued connectivity regulations and procedures.

Clause 3 (pp3–4) substitutes Clause 19.4 in full, replacing it with an "Energy and Demand Balancing" regime: entry-point open access capacity must not exceed approved exit-point capacity; drawal and injection limits are prescribed separately for open access consumers, scheduled consumers and open access generators; Green Energy Open Access consumers may hold multiple RE contracts beyond technical limits or CMD but with per-15-minute-block caps; excess injection is treated as inadvertent energy; and the open access user bears network strengthening and metering costs where capacity goes beyond CMD or line/transfer limits.

Standard name
Open Access Regulations

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document