The Andhra Pradesh Electricity Regulatory Commission's Second Amendment to the Terms and Conditions of Open Access Regulation, 2005, issued as Regulation No. 08 of 2025 and published in the Andhra Pradesh Extraordinary Gazette on 8 December 2025 (p1). It is a short instrument that changes two clauses of the Principal Regulation, after two rounds of public consultation on drafts published on 26 March 2025 and 19 August 2025 (p2).
The Introduction (pp1–2) sets out the lineage: the 2005 Principal Regulation, its adoption by the newly constituted APERC for the residual State through the 2014 Adaptation Regulation, and the first amendment of 2016. It then records that the Government of Andhra Pradesh, invoking Section 108 of the Electricity Act 2003, asked the Commission to insert a proviso tying grid connectivity for Clean Energy Projects to the progress and recommendation of the State Nodal Agency, as contemplated in GO.Ms.No.37 dated 30.10.2024, in order to implement the Integrated Clean Energy Policy, 2024.
Clause 1 (pp2–3) gives the title, extends the Regulation to the whole of Andhra Pradesh and brings it into force on gazette publication. Clause 2 (p3) adds the proviso to Clause 9.2, making grid connectivity for such Clean Energy Projects dependent on the State Nodal Agency's progress and recommendation and on compliance with Commission-issued connectivity regulations and procedures.
Clause 3 (pp3–4) substitutes Clause 19.4 in full, replacing it with an "Energy and Demand Balancing" regime: entry-point open access capacity must not exceed approved exit-point capacity; drawal and injection limits are prescribed separately for open access consumers, scheduled consumers and open access generators; Green Energy Open Access consumers may hold multiple RE contracts beyond technical limits or CMD but with per-15-minute-block caps; excess injection is treated as inadvertent energy; and the open access user bears network strengthening and metering costs where capacity goes beyond CMD or line/transfer limits.
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.