Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation

Regulation No 2 of 2025 Fourth Amendment

AmendmentDated 24 Feb 2025Published in the Gazette 25 Feb 2025

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to APERC's Electricity Supply Code Regulation, 2004, issued as Regulation No. 2 of 2025 and published in the Andhra Pradesh Gazette on 25 February 2025 (p1). It is made under s.181(2)(x) read with s.50 of the Electricity Act, 2003, extends to the whole State of Andhra Pradesh, and comes into force on the date of Gazette publication (p1).

All seven clauses deal with prepaid and smart metering. Clause 2 (p2) inserts an e-wallet mechanism at the end of clause 3.3 — a wallet linked to the supply connection that consumers recharge periodically through portals, mobile apps, retailers or kiosks. Clause 3 (p2) adds clause 4.1.6, ending physical bills for smart meters in favour of e-bills sent over mobile apps, SMS, WhatsApp or licensee web portals in English and Telugu. Clause 4 (p2) requires the licensee to give bill information in English or Telugu on request.

Clause 5 (p2) adds clause 4.3.10, which specifies what the first recharge of the month must cover (minimum, fixed/demand, customer, true-up and FPPCA charges), sets a floor and permitted denominations for subsequent recharges, allows no maximum, and provides for recovering pre-installation arrears. It also lays down the short-billing sequence — intimation, reminders, deduction from the e-wallet, and disconnection under clause 4.8.4.

Clause 6 (p3) adds clause 4.8.4, the consumer-protection core: emergency credit before disconnection, staged advance alerts, restrictions on when disconnection may occur, post-disconnection notice, permanent disconnection after a stated period, meter removal, e-wallet deactivation and reconnection under prevailing rules. Clause 7 (p3) inserts processing-time and complaint-resolution obligations for recharges and reconnections.

The amendment is signed by the Commission Secretary (i/c) at Kurnool on 24 February 2025 (p1, p3).

Standard name
Electricity Supply Code

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document