APERC · Andhra Pradesh Electricity Regulatory Commission
Green Energy Open Access Charges and Banking Regulation, 2024 — Second Amendment, 2026
Regulation 02 of 2026 Second Amendment
CopyDated 8 May 2026Published in the Gazette 21 May 2026Lr. No. APERC/Secy/F.No. S-19(Vol-IV)/D.No.278 dated 08-05-2026
A copy of the Regulation 6 of 2025 or of one of its amendments.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024), issued by the Commission from Kurnool on 08-05-2026 and published in the Andhra Pradesh Extraordinary Gazette of 21 May 2026 as Regulation No. 02 of 2026 (p1). It comes into force on the date of Gazette publication and extends to the whole State (p2).
The preamble explains the trigger: the Commission has proposed a parallel amendment to its RE tariff regulation removing the single-interconnection-point requirement for Renewable Hybrid Energy Projects, and therefore needs matching clarity in the green energy open access framework on definition, metering, scheduling, energy accounting and deviation treatment (p1–2). A draft was published with a public notice dated 19.02.2026 under s.181(3); stakeholder comments were examined and disposed of by an Order dated 08-05-2026 (p2).
The operative text is short. Clause 2 inserts a definition of Renewable Hybrid Energy Project into the Principal Regulation, covering projects drawing on a combination of renewable sources at the same or different interconnection points, with a proportionality proviso and a minimum CUF requirement for wind-solar hybrid projects (p2–3). Clause 3 adds an Explanation to clause 9(2) treating non-colocated RE hybrid projects as a single generating project for scheduling and energy accounting, capping the sum of source schedules at project capacity and treating excess as inadvertent energy; connectivity is left to TRANSCO/DISCOMs on normal technical feasibility (p3). Clause 4 requires interface meters for each source at its interconnection point (p3). Clause 5 adds a proviso to clause 12(b) exempting distribution/wheeling charges for eligible clean energy and RE manufacturing projects meeting GO.Ms.No.37 dated 30.10.2024 conditions, with DISCOMs claiming the amount from the State under s.65, and prescribes voltage-level-based wheeling and loss allocation for hybrid components at different voltages (p3–4). Clause 6 replaces the fifth proviso to clause 13 as introduced by the First Amendment, setting cross-subsidy and additional surcharge exemptions for green hydrogen and derivatives, solar module and wind turbine manufacturing, and battery manufacturing (p4).
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.