Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Green Energy Open Access Charges and Banking Regulation, 2024 — Second Amendment, 2026

Regulation 02 of 2026 Second Amendment

CopyDated 8 May 2026Published in the Gazette 21 May 2026Lr. No. APERC/Secy/F.No. S-19(Vol-IV)/D.No.278 dated 08-05-2026

A copy of the Regulation 6 of 2025 or of one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Second Amendment to the Andhra Pradesh Electricity Regulatory Commission (Green Energy Open Access, Charges, and Banking) Regulation, 2024 (Regulation No. 3 of 2024), issued by the Commission from Kurnool on 08-05-2026 and published in the Andhra Pradesh Extraordinary Gazette of 21 May 2026 as Regulation No. 02 of 2026 (p1). It comes into force on the date of Gazette publication and extends to the whole State (p2).

The preamble explains the trigger: the Commission has proposed a parallel amendment to its RE tariff regulation removing the single-interconnection-point requirement for Renewable Hybrid Energy Projects, and therefore needs matching clarity in the green energy open access framework on definition, metering, scheduling, energy accounting and deviation treatment (p1–2). A draft was published with a public notice dated 19.02.2026 under s.181(3); stakeholder comments were examined and disposed of by an Order dated 08-05-2026 (p2).

The operative text is short. Clause 2 inserts a definition of Renewable Hybrid Energy Project into the Principal Regulation, covering projects drawing on a combination of renewable sources at the same or different interconnection points, with a proportionality proviso and a minimum CUF requirement for wind-solar hybrid projects (p2–3). Clause 3 adds an Explanation to clause 9(2) treating non-colocated RE hybrid projects as a single generating project for scheduling and energy accounting, capping the sum of source schedules at project capacity and treating excess as inadvertent energy; connectivity is left to TRANSCO/DISCOMs on normal technical feasibility (p3). Clause 4 requires interface meters for each source at its interconnection point (p3). Clause 5 adds a proviso to clause 12(b) exempting distribution/wheeling charges for eligible clean energy and RE manufacturing projects meeting GO.Ms.No.37 dated 30.10.2024 conditions, with DISCOMs claiming the amount from the State under s.65, and prescribes voltage-level-based wheeling and loss allocation for hybrid components at different voltages (p3–4). Clause 6 replaces the fifth proviso to clause 13 as introduced by the First Amendment, setting cross-subsidy and additional surcharge exemptions for green hydrogen and derivatives, solar module and wind turbine manufacturing, and battery manufacturing (p4).

Standard name
Green Energy Open Access Regulations

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Consolidated copies, for reference (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document