APERC · Andhra Pradesh Electricity Regulatory Commission
Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — Consolidated
Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025
Consolidated copyDated 12 Sep 2025Regulation No. 6 of 2025 dated 12-09-2025
A consolidated copy of the Regulation 6 of 2025, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software, from pages 1 to 43 of 46. Check the regulator's original before you rely on it.
This is the consolidated text of APERC's Renewable Energy Tariff Regulation, 2025 — Regulation No. 6 of 2025 — issued by the Andhra Pradesh Electricity Regulatory Commission with its letter dated 12-09-2025 (p1–2). It sets the terms and conditions for determining tariffs under Section 62 of the Electricity Act, 2003 for grid-connected renewable energy generating stations commissioned during the Control Period, 01.04.2025 to 31.03.2030, and remains in force until 31.03.2030 unless reviewed or extended (p5, p15). The regulation applies to generating companies and distribution licensees; procurement is ordinarily to follow Section 63 competitive-bidding guidelines where applicable, but this regulation governs where the Commission determines project-specific tariffs under Sections 62 and 86 (p12). Regulation 4 sets technology-specific eligibility criteria, including small hydro up to 25 MW (p9), wind-solar hybrid with one resource at least 25% of the other and a minimum CUF threshold (p14), and RE-with-storage configurations (p14).
The first part covers definitions, scope and eligibility (p6–14). Chapter 1 (p15–18) establishes the Control Period, case-by-case project-specific tariff determination, the petition and public-notice process, tariff structure and design, and treatment of over-generation. Chapter 2 (p18–23) lays down financial principles: capital cost, debt-equity, loan tenure and interest, depreciation, return on equity, working capital, O&M escalation, rebate, late-payment surcharge, subsidy/incentive treatment, and statutory charges.
The technology-specific chapters then set the norms the Commission will apply or treat as ceilings: wind (p24), small hydro (p25), biomass Rankine-cycle (p26–27), non-fossil cogeneration (p28–29), solar PV, solar thermal and floating solar (p30–31), biomass gasifier (p31), biogas (p32), RDF/MSW (p33–34), renewable hybrid (p35), RE with storage (p36) and pumped storage (p37). Each chapter specifies items such as capital cost, CUF/PLF, auxiliary consumption, heat rate, fuel cost/GCV, O&M and tariff structure. Chapter 14 (p38) gives the Commission powers of interpretation, deviation, dispensation, relaxation, difficulty removal, practice directions and amendment. Forms 1.1, 1.2, 2.1 and 2.2 for petitions and tariff computations appear at pp39–43. The consolidated text incorporates the First Amendment (Regulation No. 12 of 2025, dated 08-12-2025) and Second Amendment (Regulation No. 03 of 2026; the title page says 21-05-2026, while one footnote says 21-03-2026).
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.