APERC · Andhra Pradesh Electricity Regulatory Commission
Renewable Energy Tariff Determination Regulation, 2025 — First Amendment, 2025 — Draft
First Amendment to the Andhra Pradesh Electricity Regulatory Commission (Terms and Conditions for Tariff Determination from Renewable Energy Sources) Regulation, 2025 (Regulation No. 6 of 2025)
Draft amendmentDated 18 Nov 2025Regulation ……..of 2025 dated 18.11.2025
Draft
A proposal that has since been finalised as the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft amendment regulation issued by the Andhra Pradesh Electricity Regulatory Commission to change a single clause of its 2025 renewable-energy tariff regulation. Pages 1–2 are the Commission's reasoning: it says it reviewed the operating performance of small hydro generating stations after the Principal Regulation was notified, found that the minimum normative Capacity Utilisation Factor (CUF) fixed in Clause 27 does not reflect actual realised CUF at many small hydel stations under prevailing flow conditions, and notes that the CERC renewable-energy tariff regulations of 2024 also prescribe a 30% CUF for small hydro projects in Andhra Pradesh. It concludes that aligning the minimum normative CUF with achievable performance is necessary for realistic tariff determination and regulatory certainty for projects commissioned during the Control Period.
The operative part (p2) is short. Clause 1 gives the short title, extends the amendment to the whole State, and provides that it comes into force on publication in the Andhra Pradesh Gazette. Clause 2 substitutes Clause 27 of the Principal Regulation with the text "It shall be project-specific and shall not be less than 30% (Project specific)." — replacing the existing 40% minimum normative CUF. The draft is signed by the Commission Secretary i/c and dated 18.11.2025 at Kurnool.
Because the amendment changes a threshold that drives tariff determination, the operative text — not the recitals — is where the effect lies: the norm moves from a flat 40% to a project-specific floor of not less than 30%, while the recitals frame the change around small hydro only.
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.