Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025

Regulation 10 of 2025 First Amendment

AmendmentDated 4 Dec 2025Published in the Gazette 8 Dec 2025No.717 dated DECEMBER 8, 2025

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Andhra Pradesh Electricity Regulatory Commission's First Amendment (Regulation No. 10 of 2025) to the 2023 Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation (Regulation No. 4 of 2023). It extends to the whole State and comes into force on Gazette publication — the Gazette is dated 8 December 2025, with the Commission's letter dated 4 December 2025 (p1, p3).

The preamble sets out why it was made: the State's Integrated Clean Energy Policy, 2024 (released 16.10.2024) and a letter from the Special Chief Secretary/Energy Department invoking Section 108 of the Electricity Act, 2003, proposing two changes to the Principal Regulation. It records the consultation path — an initial draft on 26.03.2025, a revised draft on 19.08.2025, an extended comment window to 15.09.2025, and a statement of reasons dated 04.12.2025 (p2–3).

The operative part substitutes the definitions of Virtual Net Metering and Group Net Metering, each with a prescribed hierarchy for netting exported energy across Time-of-Day slots and rules on deducting T&D losses and distribution/wheeling charges, including a waiver where injection and withdrawal are at the same voltage (p3–5). It inserts a new definition of a Distributed Energy Resources Aggregator (DERA) and a new clause 3.10 permitting DER aggregators for DISCOMs under a commercial agreement with a Commission-approved aggregator fee (p5–6). Clause 5.6 gains a table of permissible minimum, maximum and capped capacities for each metering arrangement, plus explanations on inverter-based capacity, contracted load/CMD ceilings, and multiple connections (p6–7). Clause 11.1 is replaced with the application route — DISCOM websites, Mee Seva centres, the National Solar Rooftop Portal, and the MNRE VNM/GNM SOP formats — and clause 11.2 with a capacity-banded application fee schedule (p7). Clause 13.1 is replaced with agreement submission and deemed-approval/cancellation timelines and a once-a-financial-year right to change the consumer list or sharing ratio for VNM/GNM (p7–8). Clause 15 is replaced with provisions for prosumers generally, including behind-the-meter SRTPVS with prior intimation, verification against export, charges, disconnection for non-compliance, and a 60-day CEA technical-standards compliance window for existing installations (p8). Clause 22 is replaced with a repeal-and-savings provision protecting already-commissioned projects, projects under construction, saved DISCOM procedures, and waivers/feed-in tariffs in existing agreements for their term (p9).

The Annexure (p10–14) gives worked Time-of-Day settlement illustrations for VNM, GNM and individual net metering, with a disclaimer that the Regulation prevails over the illustrations in case of conflict (p14).

Standard name
Net Metering and Rooftop Solar

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document