APERC · Andhra Pradesh Electricity Regulatory Commission
Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
Regulation 10 of 2025 First Amendment
AmendmentDated 4 Dec 2025Published in the Gazette 8 Dec 2025No.717 dated DECEMBER 8, 2025
Amends the Regulation 6 of 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Andhra Pradesh Electricity Regulatory Commission's First Amendment (Regulation No. 10 of 2025) to the 2023 Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation (Regulation No. 4 of 2023). It extends to the whole State and comes into force on Gazette publication — the Gazette is dated 8 December 2025, with the Commission's letter dated 4 December 2025 (p1, p3).
The preamble sets out why it was made: the State's Integrated Clean Energy Policy, 2024 (released 16.10.2024) and a letter from the Special Chief Secretary/Energy Department invoking Section 108 of the Electricity Act, 2003, proposing two changes to the Principal Regulation. It records the consultation path — an initial draft on 26.03.2025, a revised draft on 19.08.2025, an extended comment window to 15.09.2025, and a statement of reasons dated 04.12.2025 (p2–3).
The operative part substitutes the definitions of Virtual Net Metering and Group Net Metering, each with a prescribed hierarchy for netting exported energy across Time-of-Day slots and rules on deducting T&D losses and distribution/wheeling charges, including a waiver where injection and withdrawal are at the same voltage (p3–5). It inserts a new definition of a Distributed Energy Resources Aggregator (DERA) and a new clause 3.10 permitting DER aggregators for DISCOMs under a commercial agreement with a Commission-approved aggregator fee (p5–6). Clause 5.6 gains a table of permissible minimum, maximum and capped capacities for each metering arrangement, plus explanations on inverter-based capacity, contracted load/CMD ceilings, and multiple connections (p6–7). Clause 11.1 is replaced with the application route — DISCOM websites, Mee Seva centres, the National Solar Rooftop Portal, and the MNRE VNM/GNM SOP formats — and clause 11.2 with a capacity-banded application fee schedule (p7). Clause 13.1 is replaced with agreement submission and deemed-approval/cancellation timelines and a once-a-financial-year right to change the consumer list or sharing ratio for VNM/GNM (p7–8). Clause 15 is replaced with provisions for prosumers generally, including behind-the-meter SRTPVS with prior intimation, verification against export, charges, disconnection for non-compliance, and a 60-day CEA technical-standards compliance window for existing installations (p8). Clause 22 is replaced with a repeal-and-savings provision protecting already-commissioned projects, projects under construction, saved DISCOM procedures, and waivers/feed-in tariffs in existing agreements for their term (p9).
The Annexure (p10–14) gives worked Time-of-Day settlement illustrations for VNM, GNM and individual net metering, with a disclaimer that the Regulation prevails over the illustrations in case of conflict (p14).
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 11 Jul 2025Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.