Regulation No.4 of 2025 — Fourth Amendment to the Licensees' Duty for Supply of Electricity on Request and Recovery of Expenses Regulation, 2013
Regulation No.4 of 2025 Fourth Amendment
AmendmentDated 11 Jul 2025Published in the Gazette 11 Jul 2025
Amends the Regulation 6 of 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to APERC's 2013 Regulation on licensees' duty to supply electricity on request and recovery of expenses for providing an electric line or electrical plant. It is issued as Regulation No. 4 of 2025 and published in the Andhra Pradesh Gazette of 11 July 2025 (p1). The preamble explains the rationale — pre-determined connection charges up to 150 kW are expected to benefit consumers and ease doing business — records that a draft was placed on the Commission's website under a Public Notice of 30 May 2025, and that one public response and comments from APSPDCL were considered before the amendment was made (p1).
Clause 1 names the amendment, extends it to the whole State, brings it into force from Gazette publication, and provides that category-wise load limits in other documents such as the General Terms and Conditions of Supply or the Retail Supply Tariff Order stand corrected to the limits in this amendment (p2).
Clause 2 inserts a proviso after clause 7(1) of the principal regulation, setting out a category-wise schedule of service line charges including development charges for new or additional connections up to 150 kW made within 1 km of the electrified network, with a maximum service line of one kilometre, for FY 2025-26 (p2–3). It also deals with the LT/HT option above 100 HP or 75 kW and the tariff treatment of such LT consumers, requires application fee and security deposit under the relevant regulation, and exempts connections beyond 1 km, electrification of layouts, agricultural and related categories, farm houses and underground cables (p3). For FY 2026-27 onward, licensees may propose a fresh schedule alongside their ARR and FPT filings, with the Commission to pass an order as far as possible within 120 days; if no proposals come, the FY 2025-26 charges continue (p3–4).
Clause 3 disapplies the Annexure-I schedule of development charges to consumers covered by the new proviso (p4). Clause 4 replaces clause 8.4, requiring dedicated transformers for LT non-agricultural consumers above 20 kW contracted load with no onward supply from that transformer (p4). Clause 5 adds new clauses 13 to 15 giving the Commission power to remove difficulties, issue orders and practice directions, and amend the regulation (p4).
Read with this
The regulation
- Dated 11 Sep 2025Regulation 6 of 2025
Amendments and corrections
- Dated 24 Feb 2025Regulation No.3 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No.1 of 2025 — Third Amendment
- Dated 24 Feb 2025Regulation No. 2 of 2025 — Fourth Amendment to the Electricity Supply Code Regulation
- Dated 9 Oct 2025Licensees and Standards of Performance Regulation, 2004 — Sixth Amendment, 2025
- Dated 4 Dec 2025Regulation 8 of 2025 — Second Amendment
- Dated 4 Dec 2025Grid Interactive Solar Rooftop Photovoltaic Net/Gross Metering Regulation, 2023 — First Amendment, 2025
- Dated 4 Dec 2025Regulation 11 of 2025 — First Amendment
- Dated 5 Dec 20251st Amendment through Reg No 12 of 2025
- Dated 5 Dec 2025Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulation, 2025 — First Amendment, 2025 — Statement of Reasons
- Dated 8 Jan 2026Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Errata
- Dated 8 May 2026Regulation No 03 of 2026 — Second Amendment
- Dated 8 May 2026Renewable Energy Tariff Determination Regulation, 2025 — Second Amendment, 2026 — Statement of Reasons and Order
- Dated 30 Jul 2026Regulation No.5 of 2026 — Fifth Amendment
Commencement notices and reasons
- Dated 11 Sep 2025RE Tariff Determination Regulation, 2025 — Statement of Reasons
Consolidated copies, for reference (1)
Other copies of these documents (1)
Earlier drafts
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.