Skip to content

APERC · Andhra Pradesh Electricity Regulatory Commission

Regulation No.1 of 2025 — Third Amendment

Regulation No.1 of 2025 Third Amendment

AmendmentDated 24 Feb 2025Published in the Gazette 25 Feb 2025

Amends the Regulation 6 of 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page gazette notification in which the Andhra Pradesh Electricity Regulatory Commission amends its 2013 regulation on licensees' duty to supply electricity on request and recovery of expenses for providing an electric line or electrical plant (Regulation No. 4 of 2013). The Third Amendment is Regulation No. 1 of 2025, issued from Kurnool on 24 February 2025 and published in the Andhra Pradesh Gazette on 25 February 2025 (p1).

Clause 1 gives the short title, extends the amendment to the whole of Andhra Pradesh and brings it into force on the date of gazette publication (p1).

Clause 2 substitutes Clause 7(2) of the principal regulation in full (p2). The new text restates the distribution licensee's duty to provide a meter and requires smart meters, including the display unit, meeting the technical requirements of the CEA (Installation and Operation of Meters) Regulations, 2006 and its subsequent amendments. It specifies two-way communication, compatibility with AMI and AMR applications, and a built-in security mechanism against attempts to steal codes. It then allocates the meter and allied equipment cost between the licensee and the consumer: where the licensee bears the cost it may collect Commission-approved meter rent under section 45 or in Tariff Orders; where the consumer bears the full cost, no meter rent is recoverable (p2).

No other provision of the principal regulation is touched.

Standard name
Duty to Supply on Request, Recovery of Expenditure and Miscellaneous Charges

Read with this

The regulation

Commencement notices and reasons

Consolidated copies, for reference (1)

Other copies of these documents (1)

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document