Skip to content

CERC · Central Electricity Regulatory Commission

Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft

Determination of generic levellised generation tariff for the FY 2015-16 under Regulation 8 of the Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012.

Draft regulationDated 3 Mar 2015Petition No. SM/004/2015 (Suo-Motu) dated 03rd March 2015

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's suo-motu order in Petition No. SM/004/2015 dated 3 March 2015, dealing with the generic levellised generation tariff for renewable energy technologies for FY 2015-16, the fourth year of the five-year control period under the RE Tariff Regulations, 2012 (p1–4). The order recites the Commission's mandate under Regulation 8(1) to determine generic tariffs annually on a suo-motu petition, notes that project-specific tariffs remain available for new or emerging technologies, and records the First Amendment Regulations, 2014 on biomass norms (p2–3). The FY 2015-16 proposal is placed in Annexure-I and stakeholder comments are invited by 18 March 2015 (p3).

Pages 4–30 set out the methodology and inputs: useful life, control period, tariff period, tariff structure and levellisation; the discount factor based on post-tax weighted average cost of capital; normative capital cost and its indexation through WPI steel and electrical machinery; debt-equity ratio; return on equity; interest on loan; depreciation; working capital; O&M expenses; CUF/PLF; auxiliary consumption; station heat rate; fuel mix; calorific values; fuel price indexation; subsidy and accelerated depreciation treatment (pp4–30). Technology-specific capital costs and fuel prices are proposed for wind, small hydro, biomass Rankine, non-fossil cogeneration, solar PV, solar thermal, biomass gasifier and biogas (pp9–30).

Pages 30–36 present the FY 2015-16 tariff schedule: levellised total tariff, accelerated depreciation benefit and net levellised tariff by technology, wind zone, small-hydro region and size, biomass variant and state, cogeneration, biomass gasifier, biogas, solar PV and solar thermal. The tables are followed by an index of detailed annexures (pp34–36). Appendices 1–10 contain the capital cost and fuel price indexation computations (pp37–51). The bulk of the document, pp52–228, contains technology- and state-wise assumption sheets and year-by-year tariff determinations, including accelerated depreciation benefit calculations.

The practical effect is to establish benchmark generic tariffs for RE projects commissioned in FY 2015-16 and to provide the computational basis for those tariffs, while leaving project-specific tariffs to separate petitions. It applies CERC-wide, with state-specific fuel prices and biomass/cogeneration tariff tables. Although the order frames the exercise as a proposal for comments, the later tariff tables use 'determined' language (p30–34).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document