CERC · Central Electricity Regulatory Commission
RE Tariff Regulations, 2012 — Fourth Amendment, 2015
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015
AmendmentDated 7 Oct 2015No. L-1/94/CERC/2011 dated 7 th October ,2015
Replaced by RE Tariff Regulations, 2017
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012, notified on 7 October 2015 under s.61 read with s.178 of the Electricity Act, 2003 (p1). Its single purpose is to bring municipal solid waste (MSW) and refuse-derived fuel (RDF) based power projects into the RE tariff framework, which previously did not cover them.
The amendment first defines the new fuels and fixes their tariff period, inserting definitions of 'municipal solid waste' and 'refuse derived fuel' into Regulation 2 and adding a twenty-year tariff period for both technologies (p1). It then widens the applicability proviso of Regulation 3 and adds matching eligibility clauses under Regulation 4, so MSW and RDF projects qualify only if they use new plant and machinery based on Rankine cycle technology with the respective fuel (p1–2).
Further clauses amend the tariff period provisions of Regulation 6, allow project-specific tariff for these projects under Regulation 7 (to be guided by the new Chapter 5A), and give them 'MUST RUN' status exempt from merit order despatch, while subjecting them to the Grid Code and Unscheduled Interchange regulations for scheduling and despatch (p2–3). Regulation 17(2) is rewritten to prescribe the working-capital components for MSW/RDF, biomass, biogas and non-fossil cogeneration projects (p3).
The substantive core is the new Chapter 5A (Regulations 33A–33G, p3–5), which sets technology-specific tariff parameters for MSW/RDF Rankine-cycle projects: eligible technologies, normative capital cost for FY 2015-16 differentiated by fuel, plant load factor and stabilisation period, auxiliary consumption, station heat rate, O&M expense norms with escalation, calorific value, and RDF fuel price with an optional annual escalation. Finally, the amendment retitles and revises output Forms 2.1 and 2.2 so they can capture MSW/RDF parameters and tariff components (p5–6). A closing note lists the Gazette publication dates of the Principal Regulations and the First, Second and Third Amendments (p6).
Read with this
The regulation
Amendments and corrections
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014
- Dated 5 Jan 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 10 Jul 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment, 2016
Commencement notices and reasons
- Dated 6 Feb 2012RE Tariff Regulations, 2012 — Statement of Objects and Reasons
- Dated 18 Mar 2014RE Tariff Regulations, 2012 — First Amendment, 2014 — Statement of Reasons
- Dated 5 Jan 2015RE Tariff Determination (Second Amendment) Regulations, 2014 — Statement of Reasons
- Dated 10 Jul 2015RE Tariff Third Amendment Regulations, 2015 — Statement of Reasons
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons
- Dated 30 Mar 2016RE Tariff Regulations, 2012 — Fifth Amendment, 2016 — Statement of Reasons
Other copies of these documents (5)
- Dated 6 Feb 2012RE Tariff Regulations, 2012
- Dated 5 Jan 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources, 2012 — First Amendment Regulations, 2014
- Dated 7 Oct 2015Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment Regulations, 2016
Proposed changes (drafts with no final yet)
- Dated 3 Mar 2015Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft
- Dated 3 Mar 2015File: Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft
- Dated 3 Mar 2015Public notice: Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 — Public Notice
Earlier drafts
- Dated 6 Dec 2013RE Tariff (First Amendment) Regulations, 2013 — Draft
- Dated 6 Dec 2013Public notice: Renewable Energy Sources Tariff (First Amendment) Regulations, 2013 — Draft
- Released with the notice dated 6 Dec 2013Explanatory memorandum: RE Tariff Regulations, 2012 — First Amendment, 2013 — Explanatory Memorandum
- Dated 25 Nov 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014 — Draft
- Dated 25 Nov 2014Public notice: RE Tariff Determination (Second Amendment) Regulations, 2014 — Public Notice
- Released with the notice dated 25 Nov 2014Explanatory memorandum: RE Tariff (Second Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2014 — Third Amendment — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Public notice: Draft RE Tariff Determination (Third Amendment) Regulations, 2015 — Public Notice
- Released with the notice dated 10 Aug 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF
- Released with the notice dated 10 Aug 2015Explanatory memorandum: MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum
- Dated 10 Aug 2015Public notice: Public Notice — Proposed Generic Tariff Norms for Municipal Solid Waste/Waste to Energy Projects and Indicative Tariff for 2015-16
- Dated 16 Mar 2016Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Mar 2016Public notice: Renewable Energy Sources Tariff Regulations, 2012 — Fifth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 16 Mar 2016Explanatory memorandum: Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.