Skip to content

CERC · Central Electricity Regulatory Commission

RE Tariff Regulations, 2012 — Fourth Amendment, 2015

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015

AmendmentDated 7 Oct 2015No. L-1/94/CERC/2011 dated 7 th October ,2015

Replaced by RE Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012, notified on 7 October 2015 under s.61 read with s.178 of the Electricity Act, 2003 (p1). Its single purpose is to bring municipal solid waste (MSW) and refuse-derived fuel (RDF) based power projects into the RE tariff framework, which previously did not cover them.

The amendment first defines the new fuels and fixes their tariff period, inserting definitions of 'municipal solid waste' and 'refuse derived fuel' into Regulation 2 and adding a twenty-year tariff period for both technologies (p1). It then widens the applicability proviso of Regulation 3 and adds matching eligibility clauses under Regulation 4, so MSW and RDF projects qualify only if they use new plant and machinery based on Rankine cycle technology with the respective fuel (p1–2).

Further clauses amend the tariff period provisions of Regulation 6, allow project-specific tariff for these projects under Regulation 7 (to be guided by the new Chapter 5A), and give them 'MUST RUN' status exempt from merit order despatch, while subjecting them to the Grid Code and Unscheduled Interchange regulations for scheduling and despatch (p2–3). Regulation 17(2) is rewritten to prescribe the working-capital components for MSW/RDF, biomass, biogas and non-fossil cogeneration projects (p3).

The substantive core is the new Chapter 5A (Regulations 33A–33G, p3–5), which sets technology-specific tariff parameters for MSW/RDF Rankine-cycle projects: eligible technologies, normative capital cost for FY 2015-16 differentiated by fuel, plant load factor and stabilisation period, auxiliary consumption, station heat rate, O&M expense norms with escalation, calorific value, and RDF fuel price with an optional annual escalation. Finally, the amendment retitles and revises output Forms 2.1 and 2.2 so they can capture MSW/RDF parameters and tariff components (p5–6). A closing note lists the Gazette publication dates of the Principal Regulations and the First, Second and Third Amendments (p6).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.