Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft

Determination of Benchmark Capital Cost Norm for Solar PV power projects and Solar Thermal power projects applicable during FY 2015-16

Published with a draftDated 3 Mar 2015Petition No. SM/005/2015 (Suo-Motu) dated 3 rd March 2015

Draft

Voltaic holds no final regulation made from this draft.

Published with the Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a suo-motu order of the Central Electricity Regulatory Commission dated 3 March 2015 that opens consultation on the benchmark capital cost norms for solar PV and solar thermal (CSP) power projects for FY 2015-16. Pages 1-2 set out the legal hook — the CERC RE Tariff Regulations, 2012, whose first proviso to Regulation 5 lets the Commission review the solar benchmark cost annually, with the norms themselves carried under Regulation 57(1) for solar PV and Regulation 61(1) for solar thermal. The order recalls the previous exercise for FY 2014-15 and invites stakeholder comments on the enclosed proposal by 18 March 2015 (p2).

Annexure-I is the proposal itself. Part A (p3-7) builds the solar PV norm from the bottom up: a module price benchmarked to international spot-price reports and an RBI exchange rate average, plus a notional module degradation allowance, then the non-module components — land, power conditioning unit/inverter, civil and general works, ground mounting structures, cables and transformers, and preliminary/pre-operative and financing costs — closing with a consolidated component-wise breakup table (p7). Part B (p8) takes up concentrated solar thermal, describes the four commercially available CSP technologies and proposes a single solar thermal benchmark capital cost for FY 2015-16 on the strength of parabolic trough cost data, other technologies' cost data not being established.

The document decides nothing finally: every number in it is a proposal placed for comment, to be given effect, if at all, by a subsequent order.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document