CERC · Central Electricity Regulatory Commission
Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft
Determination of Benchmark Capital Cost Norm for Solar PV power projects and Solar Thermal power projects applicable during FY 2015-16
Published with a draftDated 3 Mar 2015Petition No. SM/005/2015 (Suo-Motu) dated 3 rd March 2015
Draft
Voltaic holds no final regulation made from this draft.
Published with the Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a suo-motu order of the Central Electricity Regulatory Commission dated 3 March 2015 that opens consultation on the benchmark capital cost norms for solar PV and solar thermal (CSP) power projects for FY 2015-16. Pages 1-2 set out the legal hook — the CERC RE Tariff Regulations, 2012, whose first proviso to Regulation 5 lets the Commission review the solar benchmark cost annually, with the norms themselves carried under Regulation 57(1) for solar PV and Regulation 61(1) for solar thermal. The order recalls the previous exercise for FY 2014-15 and invites stakeholder comments on the enclosed proposal by 18 March 2015 (p2).
Annexure-I is the proposal itself. Part A (p3-7) builds the solar PV norm from the bottom up: a module price benchmarked to international spot-price reports and an RBI exchange rate average, plus a notional module degradation allowance, then the non-module components — land, power conditioning unit/inverter, civil and general works, ground mounting structures, cables and transformers, and preliminary/pre-operative and financing costs — closing with a consolidated component-wise breakup table (p7). Part B (p8) takes up concentrated solar thermal, describes the four commercially available CSP technologies and proposes a single solar thermal benchmark capital cost for FY 2015-16 on the strength of parabolic trough cost data, other technologies' cost data not being established.
The document decides nothing finally: every number in it is a proposal placed for comment, to be given effect, if at all, by a subsequent order.
Read with this
The regulation
Amendments and corrections
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014
- Dated 5 Jan 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 10 Jul 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment, 2016
Commencement notices and reasons
- Dated 6 Feb 2012RE Tariff Regulations, 2012 — Statement of Objects and Reasons
- Dated 18 Mar 2014RE Tariff Regulations, 2012 — First Amendment, 2014 — Statement of Reasons
- Dated 5 Jan 2015RE Tariff Determination (Second Amendment) Regulations, 2014 — Statement of Reasons
- Dated 10 Jul 2015RE Tariff Third Amendment Regulations, 2015 — Statement of Reasons
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons
- Dated 30 Mar 2016RE Tariff Regulations, 2012 — Fifth Amendment, 2016 — Statement of Reasons
Other copies of these documents (5)
- Dated 6 Feb 2012RE Tariff Regulations, 2012
- Dated 5 Jan 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources, 2012 — First Amendment Regulations, 2014
- Dated 7 Oct 2015Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment Regulations, 2016
Proposed changes (drafts with no final yet)
Earlier drafts
- Dated 6 Dec 2013RE Tariff (First Amendment) Regulations, 2013 — Draft
- Dated 6 Dec 2013Public notice: Renewable Energy Sources Tariff (First Amendment) Regulations, 2013 — Draft
- Released with the notice dated 6 Dec 2013Explanatory memorandum: RE Tariff Regulations, 2012 — First Amendment, 2013 — Explanatory Memorandum
- Dated 25 Nov 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014 — Draft
- Dated 25 Nov 2014Public notice: RE Tariff Determination (Second Amendment) Regulations, 2014 — Public Notice
- Released with the notice dated 25 Nov 2014Explanatory memorandum: RE Tariff (Second Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2014 — Third Amendment — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Public notice: Draft RE Tariff Determination (Third Amendment) Regulations, 2015 — Public Notice
- Released with the notice dated 10 Aug 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF
- Released with the notice dated 10 Aug 2015Explanatory memorandum: MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum
- Dated 10 Aug 2015Public notice: Public Notice — Proposed Generic Tariff Norms for Municipal Solid Waste/Waste to Energy Projects and Indicative Tariff for 2015-16
- Dated 16 Mar 2016Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Mar 2016Public notice: Renewable Energy Sources Tariff Regulations, 2012 — Fifth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 16 Mar 2016Explanatory memorandum: Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.