Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Second Amendment) Regulations, 2014

Gazette copyDated 5 Jan 2014Published in the Gazette 5 Jan 2015L-1/94/CERC/2011 dated 5th January, 2014

Replaced by RE Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

A Gazette copy of the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012 or of one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Central Electricity Regulatory Commission notification (No. L-1/94/CERC/2011) amending the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012 — called "the Principal Regulations" — for the second time (p2). It was published in the Gazette of India, Extraordinary, Part III, Section 4, No. 06, dated Monday 5 January 2015 (p1), though the notification text itself is headed "New Delhi, the 5th January, 2014" (p2); the year in the body appears to be a typographical slip against the 2015 Gazette masthead.

The operative part is very short: two substitution clauses. Clause 2 replaces Regulation 41 of the Principal Regulations, capping the use of fossil fuels in the relevant renewable projects at 15% of calorific value on an annual basis and sunsetting that cap on 31 March 2017 (p2). Clause 3 replaces Regulation 4(c), restating what counts as a biomass power project based on Rankine cycle technology — new plant and machinery, biomass fuel sources, and the same 15% fossil-fuel restriction with the same 31 March 2017 end-date (p2).

The regulations come into force from the date of publication in the Official Gazette and remain valid until 31 March 2017 (p2). A closing note records that the Principal Regulations were published on 7 February 2012 and the First Amendment Regulations on 21 March 2013 (p2). Its practical importance is narrow but pointed: it fixes the fossil-fuel co-firing ceiling that decides which biomass projects remain eligible for renewable-energy tariffs, and the deadline after which that ceiling ceases to apply.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff

Read with this

Other copies of these documents (4)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document