CERC · Central Electricity Regulatory Commission
MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum
Proposed norms for determination of generic tariff for Municipal Solid Waste/Waste to Energy projects and indicative tariff for 2015-16
Explanatory memorandum to a draftReleased with the notice dated 10 Aug 2015
Draft
The draft has since been finalised as the RE Tariff Regulations, 2012 — Fourth Amendment, 2015.
Explanatory memorandum to the draft Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Explanatory Memorandum explaining the norms it proposes for a generic tariff for electricity generated from municipal solid waste (MSW) and refuse-derived fuel (RDF), together with an indicative tariff for FY 2015-16 (p1). It accompanies a petition by the Waste Management Association under sections 61, 62, 64 and 86(1)(e) of the Electricity Act, 2003; tariff determination for MSW projects is currently project-specific under the CERC RE Tariff Regulations, 2012, and the memorandum proposes a benchmark route instead (p1).
Section 1 (pp1–2) sets out the rationale: the Niti Aayog/Planning Commission Task Force report of 12 May 2014 treats waste-to-energy as integral to MSW management, scientific landfill land needs are large, and WtE needs far less land. The Commission accepts the sector is small in MW terms but socially and environmentally important, and notes two operating technologies — combustion/incineration and bio-methanation (p2).
Section 2 (pp2–9) is the core. It lists the parameters for a generic tariff — capital cost; fixed cost components (debt-equity ratio, depreciation, interest on loan, interest on working capital, O&M, return on equity); and energy charges (PLF, station heat rate, auxiliary consumption, gross calorific value, fuel cost) — then reasons through each, drawing on MNRE and MoUD project data, on MPERC and GERC tariff orders, and on the biomass Rankine-cycle benchmarks in the RE Tariff Regulations, 2012. It proposes separate normative capital cost, O&M, PLF and fuel treatment for RDF-based and raw-MSW plants, with no fuel cost for MSW (pp3–9).
Section 3 (pp9–10) applies the biomass Rankine-cycle principles to everything not specifically covered, and proposes must-run status, scheduling per Commission regulations/codes, 20-year PPAs with priority payment by beneficiaries, and disposal of non-combustible residue per MoUD/MoEF/MNRE and pollution control board norms. Section 4 (p10) presents the resulting levellised fixed cost, variable cost, applicable tariff and accelerated-depreciation-adjusted net tariff for both technologies, valid for the 20-year useful life of projects commissioned in FY 2015-16, with the RDF variable component escalating annually.
The balance of the document (pp11–40) is the supporting arithmetic: assumption sheets and year-by-year schedules for capital cost, depreciation, variable cost, return on equity, long-term debt, working capital and O&M, run separately for the MSW and RDF cases.
Read with this
The regulation
Amendments and corrections
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014
- Dated 5 Jan 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 10 Jul 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment, 2016
Commencement notices and reasons
- Dated 6 Feb 2012RE Tariff Regulations, 2012 — Statement of Objects and Reasons
- Dated 18 Mar 2014RE Tariff Regulations, 2012 — First Amendment, 2014 — Statement of Reasons
- Dated 5 Jan 2015RE Tariff Determination (Second Amendment) Regulations, 2014 — Statement of Reasons
- Dated 10 Jul 2015RE Tariff Third Amendment Regulations, 2015 — Statement of Reasons
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons
- Dated 30 Mar 2016RE Tariff Regulations, 2012 — Fifth Amendment, 2016 — Statement of Reasons
Other copies of these documents (5)
- Dated 6 Feb 2012RE Tariff Regulations, 2012
- Dated 5 Jan 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources, 2012 — First Amendment Regulations, 2014
- Dated 7 Oct 2015Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment Regulations, 2016
Proposed changes (drafts with no final yet)
- Dated 3 Mar 2015Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft
- Dated 3 Mar 2015File: Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft
- Dated 3 Mar 2015Public notice: Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 — Public Notice
Earlier drafts
- Dated 6 Dec 2013RE Tariff (First Amendment) Regulations, 2013 — Draft
- Dated 6 Dec 2013Public notice: Renewable Energy Sources Tariff (First Amendment) Regulations, 2013 — Draft
- Released with the notice dated 6 Dec 2013Explanatory memorandum: RE Tariff Regulations, 2012 — First Amendment, 2013 — Explanatory Memorandum
- Dated 25 Nov 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014 — Draft
- Dated 25 Nov 2014Public notice: RE Tariff Determination (Second Amendment) Regulations, 2014 — Public Notice
- Released with the notice dated 25 Nov 2014Explanatory memorandum: RE Tariff (Second Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2014 — Third Amendment — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Public notice: Draft RE Tariff Determination (Third Amendment) Regulations, 2015 — Public Notice
- Released with the notice dated 10 Aug 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF
- Dated 10 Aug 2015Public notice: Public Notice — Proposed Generic Tariff Norms for Municipal Solid Waste/Waste to Energy Projects and Indicative Tariff for 2015-16
- Dated 16 Mar 2016Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Mar 2016Public notice: Renewable Energy Sources Tariff Regulations, 2012 — Fifth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 16 Mar 2016Explanatory memorandum: Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.