CERC · Central Electricity Regulatory Commission

MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum

Proposed norms for determination of generic tariff for Municipal Solid Waste/Waste to Energy projects and indicative tariff for 2015-16

Explanatory memorandum to a draftReleased with the notice dated 10 Aug 2015

Draft

The draft has since been finalised as the RE Tariff Regulations, 2012 — Fourth Amendment, 2015.

Explanatory memorandum to the draft Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Explanatory Memorandum explaining the norms it proposes for a generic tariff for electricity generated from municipal solid waste (MSW) and refuse-derived fuel (RDF), together with an indicative tariff for FY 2015-16 (p1). It accompanies a petition by the Waste Management Association under sections 61, 62, 64 and 86(1)(e) of the Electricity Act, 2003; tariff determination for MSW projects is currently project-specific under the CERC RE Tariff Regulations, 2012, and the memorandum proposes a benchmark route instead (p1).

Section 1 (pp1–2) sets out the rationale: the Niti Aayog/Planning Commission Task Force report of 12 May 2014 treats waste-to-energy as integral to MSW management, scientific landfill land needs are large, and WtE needs far less land. The Commission accepts the sector is small in MW terms but socially and environmentally important, and notes two operating technologies — combustion/incineration and bio-methanation (p2).

Section 2 (pp2–9) is the core. It lists the parameters for a generic tariff — capital cost; fixed cost components (debt-equity ratio, depreciation, interest on loan, interest on working capital, O&M, return on equity); and energy charges (PLF, station heat rate, auxiliary consumption, gross calorific value, fuel cost) — then reasons through each, drawing on MNRE and MoUD project data, on MPERC and GERC tariff orders, and on the biomass Rankine-cycle benchmarks in the RE Tariff Regulations, 2012. It proposes separate normative capital cost, O&M, PLF and fuel treatment for RDF-based and raw-MSW plants, with no fuel cost for MSW (pp3–9).

Section 3 (pp9–10) applies the biomass Rankine-cycle principles to everything not specifically covered, and proposes must-run status, scheduling per Commission regulations/codes, 20-year PPAs with priority payment by beneficiaries, and disposal of non-combustible residue per MoUD/MoEF/MNRE and pollution control board norms. Section 4 (p10) presents the resulting levellised fixed cost, variable cost, applicable tariff and accelerated-depreciation-adjusted net tariff for both technologies, valid for the 20-year useful life of projects commissioned in FY 2015-16, with the RDF variable component escalating annually.

The balance of the document (pp11–40) is the supporting arithmetic: assumption sheets and year-by-year schedules for capital cost, depreciation, variable cost, return on equity, long-term debt, working capital and O&M, run separately for the MSW and RDF cases.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.