Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012

Regulation · Gazette copyDated 6 Feb 2012Published in the Gazette 7 Feb 2012In force from 1 Apr 2012L-1/94/CERC/2011 dated 6th February, 2012

Replaced by RE Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 56 of 65. Check the regulator's original before you rely on it.

These are CERC's renewable-energy tariff regulations, issued under the Electricity Act 2003, published in the Gazette on 7 Feb 2012 and commenced on 1 Apr 2012 for a five-year control period (p1–2, p9). The pages are a consolidated text: footnotes mark amendments by First–Fifth Amendment Regulations and a corrigendum, so later dates and inserted provisions are visible throughout (p4–5, p28, p31, p45).

The opening definitions and scope establish what counts as renewable energy and which projects are eligible: wind, small hydro up to 25 MW, biomass Rankine cycle, non-fossil cogeneration, solar PV and thermal, biomass gasifier, biogas, and later MSW/RDF (p2–9). Chapter 1 lays out the control period, tariff periods, project-specific tariff route, petition requirements, single-part versus two-part tariff design, levellisation and must-run/dispatch treatment (p9–15). Chapter 2 sets common financial principles — capital cost scope, debt-equity, loans, depreciation, return on equity, working capital, O&M, rebate, late payment, CDM sharing, subsidy and taxes (p15–21).

Technology chapters then set, for each technology, capital cost and indexation, CUF or PLF, auxiliary consumption, heat rate, fuel cost and fuel price indexation, and O&M expenses (pp21–56).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (4)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document