Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015

Draft amendmentReleased with the notice dated 10 Aug 2015No. L-1/94/CERC/2011 dated ___ August, 2015

Draft

A proposal that has since been finalised as the RE Tariff Regulations, 2012 — Fourth Amendment, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Fourth Amendment to the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012. It brings municipal solid waste (MSW) and refuse derived fuel (RDF) based power projects inside the renewable tariff framework as a distinct technology category, and does so in 18 numbered clauses spread over six pages.

Clauses 1–4 (p1) start the regulations, define 'Municipal solid waste' and 'Refuse Derived Fuel' as new clauses in Regulation 2, fix the tariff period for MSW/RDF projects, and widen the proviso to Regulation 3 so that the regulations apply to MSW and RDF projects subject to eligibility criteria. Clauses 5–7 (p1–2) add the eligibility tests in Regulation 4 — the plant must be new machinery based on Rankine cycle technology using MSW or RDF as fuel. Clauses 8–10 (p2) amend the tariff period clause and route project-specific tariffs for MSW/RDF through a new Chapter 5A.

Clauses 11–12 (p2–3) declare MSW/RDF projects 'must run' and exempt from merit order despatch, while simultaneously subjecting them to the scheduling and despatch code under IEGC and the 2009 Unscheduled Interchange regulations. Clause 13 (p3) amends the working capital computation in Regulation 17 to name MSW and RDF alongside biomass, biogas and non-fossil cogeneration.

Clause 14 (p3–5) inserts the substantive new Chapter 5A, which sets technology-specific tariff parameters for MSW/RDF Rankine cycle projects: technology aspect, normative capital cost for FY 2015-16 with annual review, threshold plant load factor with a stabilisation period, auxiliary consumption, station heat rate, O&M expenses with escalation, and calorific value plus RDF price escalation. Clauses 15–18 (p5–6) amend Forms 2.1 and 2.2 so that MSW and RDF line items appear in the fuel-assumption and variable-charge templates. A closing note (p6) records the Gazette publication history of the Principal Regulations and the first three amendments.

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.