CERC · Central Electricity Regulatory Commission
Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF
Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015
Draft amendmentReleased with the notice dated 10 Aug 2015No. L-1/94/CERC/2011 dated ___ August, 2015
Draft
A proposal that has since been finalised as the RE Tariff Regulations, 2012 — Fourth Amendment, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Fourth Amendment to the CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2012. It brings municipal solid waste (MSW) and refuse derived fuel (RDF) based power projects inside the renewable tariff framework as a distinct technology category, and does so in 18 numbered clauses spread over six pages.
Clauses 1–4 (p1) start the regulations, define 'Municipal solid waste' and 'Refuse Derived Fuel' as new clauses in Regulation 2, fix the tariff period for MSW/RDF projects, and widen the proviso to Regulation 3 so that the regulations apply to MSW and RDF projects subject to eligibility criteria. Clauses 5–7 (p1–2) add the eligibility tests in Regulation 4 — the plant must be new machinery based on Rankine cycle technology using MSW or RDF as fuel. Clauses 8–10 (p2) amend the tariff period clause and route project-specific tariffs for MSW/RDF through a new Chapter 5A.
Clauses 11–12 (p2–3) declare MSW/RDF projects 'must run' and exempt from merit order despatch, while simultaneously subjecting them to the scheduling and despatch code under IEGC and the 2009 Unscheduled Interchange regulations. Clause 13 (p3) amends the working capital computation in Regulation 17 to name MSW and RDF alongside biomass, biogas and non-fossil cogeneration.
Clause 14 (p3–5) inserts the substantive new Chapter 5A, which sets technology-specific tariff parameters for MSW/RDF Rankine cycle projects: technology aspect, normative capital cost for FY 2015-16 with annual review, threshold plant load factor with a stabilisation period, auxiliary consumption, station heat rate, O&M expenses with escalation, and calorific value plus RDF price escalation. Clauses 15–18 (p5–6) amend Forms 2.1 and 2.2 so that MSW and RDF line items appear in the fuel-assumption and variable-charge templates. A closing note (p6) records the Gazette publication history of the Principal Regulations and the first three amendments.
Read with this
The regulation
Amendments and corrections
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014
- Dated 5 Jan 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 10 Jul 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment, 2016
Commencement notices and reasons
- Dated 6 Feb 2012RE Tariff Regulations, 2012 — Statement of Objects and Reasons
- Dated 18 Mar 2014RE Tariff Regulations, 2012 — First Amendment, 2014 — Statement of Reasons
- Dated 5 Jan 2015RE Tariff Determination (Second Amendment) Regulations, 2014 — Statement of Reasons
- Dated 10 Jul 2015RE Tariff Third Amendment Regulations, 2015 — Statement of Reasons
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons
- Dated 30 Mar 2016RE Tariff Regulations, 2012 — Fifth Amendment, 2016 — Statement of Reasons
Other copies of these documents (5)
- Dated 6 Feb 2012RE Tariff Regulations, 2012
- Dated 5 Jan 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources, 2012 — First Amendment Regulations, 2014
- Dated 7 Oct 2015Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment Regulations, 2016
Proposed changes (drafts with no final yet)
- Dated 3 Mar 2015Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft
- Dated 3 Mar 2015File: Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft
- Dated 3 Mar 2015Public notice: Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 — Public Notice
Earlier drafts
- Dated 6 Dec 2013RE Tariff (First Amendment) Regulations, 2013 — Draft
- Dated 6 Dec 2013Public notice: Renewable Energy Sources Tariff (First Amendment) Regulations, 2013 — Draft
- Released with the notice dated 6 Dec 2013Explanatory memorandum: RE Tariff Regulations, 2012 — First Amendment, 2013 — Explanatory Memorandum
- Dated 25 Nov 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014 — Draft
- Dated 25 Nov 2014Public notice: RE Tariff Determination (Second Amendment) Regulations, 2014 — Public Notice
- Released with the notice dated 25 Nov 2014Explanatory memorandum: RE Tariff (Second Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft
- Released with the notice dated 16 Apr 2015Explanatory memorandum: Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2014 — Third Amendment — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Public notice: Draft RE Tariff Determination (Third Amendment) Regulations, 2015 — Public Notice
- Dated 16 Mar 2016Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Mar 2016Public notice: Renewable Energy Sources Tariff Regulations, 2012 — Fifth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 16 Mar 2016Explanatory memorandum: Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft
- Released with the notice dated 10 Aug 2015Explanatory memorandum: MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum
- Dated 10 Aug 2015Public notice: Public Notice — Proposed Generic Tariff Norms for Municipal Solid Waste/Waste to Energy Projects and Indicative Tariff for 2015-16
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.