Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014

Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (First Amendment) Regulations, 2014

AmendmentDated 18 Mar 2014L-1/94/CERC/2011 dated 18.03.2014

Replaced by RE Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's First Amendment to the 2012 RE Tariff Regulations, issued as Notification No. L-1/94/CERC/2011 dated 18.03.2014 (p1). It does not rewrite the whole framework: it substitutes a short list of cost and performance norms that apply to biomass power projects, and it is drafted as a series of clause-by-clause substitutions of the Principal Regulations (p1–3).

The operative clauses (p1–3) replace Regulation 34 with normative capital cost figures for Rankine-cycle biomass projects, differentiated by condenser type (water-cooled or air-cooled) and by whether the project is based on rice straw and juliflora plantation or not; replace Regulation 37 with auxiliary power consumption norms, again split by condenser type and by first year versus later years of operation; replace Regulation 38 with station heat rate norms for travelling-grate and AFBC boilers; replace clause (1) of Regulation 39 with the normative O&M expense for the second year of the control period, expressly stated as FY 2013-14; replace Regulation 41 so that use of fossil fuel is not allowed; and replace Regulation 43 with a single normative calorific value for biomass fuel (p1–3).

Clause 8 is different in character: instead of fixing a value, it adds a paragraph at the end of Regulation 44 allowing biomass fuel price to be decided annually by the appropriate Regulatory Commission through an independent survey conducted by a State level committee drawn from the State Nodal Agency, State Government, distribution licensees, biomass power producers' association and others (p3). That devolves a pricing input to the states rather than the Centre.

Two timing points matter. The amendment takes effect only from the date of publication in the Official Gazette, and no Gazette date is printed (p1). And the O&M norm it prescribes is for FY 2013-14, a year already under way when the notification issued in March 2014 — a backward-looking fix (p2). The Note at the end records where the Principal Regulations were published (p3).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Renewable energy tariff, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document