RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons

The Central Electricity Regulatory Commission (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Fourth Amendment) Regulations, 2015( Norms for determination of generic tariff for Municipal Solid Waste/Waste to Energy projects and indicative tariff for 2015-16)

Statement of reasonsDated 7 Oct 2015

Replaced by RE Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2012 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's Statement of Reasons for the Fourth Amendment to its 2012 RE Tariff Regulations, dated 7 October 2015 (p1). It is the reasoning record behind the amendment that creates a generic-tariff framework for municipal solid waste (MSW) and refuse-derived-fuel (RDF) waste-to-energy projects; the operative notification itself is not reproduced.

Background: the Ministry of Urban Development asked CERC to fix WtE tariffs to support the Swachh Bharat Mission target of processing all municipal waste by 2 October 2019, with the Ministry of Power moving to require DISCOMs to buy all MSW power. A draft amendment was published for comment on 10 August 2015, comments closed 10 September 2015 and a public hearing was held on 18 September 2015 (p1–3).

Part A (p3–20) takes each proposed amendment in turn — definitions in Regulation 2, eligibility in Regulation 4, despatch principles in Regulation 11, and new Regulations 33A–33H on technology, capital cost, PLF, auxiliary consumption, station heat rate, O&M, calorific value and fuel cost — setting out the draft text, stakeholder comments and the Commission's decision on each. The Commission accepted some industry points (de-stoning in the RDF definition, higher auxiliary consumption and O&M) and refused others (support fuel, exemption from scheduling and despatch codes) (p4–7, p14, p17).

Part B (p20–25) addresses comments outside the amendment: interest on loan and working capital, PPA structure, disposal of non-combustible waste, and miscellaneous requests for transmission-charge, cross-subsidy and RPO relief, which the Commission holds outside its purview. It closes by saying all other elements follow the biomass Rankine-cycle principles (p25).

Page 26 gives the resulting indicative FY 2015-16 tariff — levellised fixed cost, variable cost and accelerated-depreciation benefit — applicable for the 20-year useful life of plants commissioned in FY 2015-16. Pages 27–55 are the MSW and RDF computation worksheets (assumptions, depreciation, variable cost, return on equity, debt schedule, working capital, O&M).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Capital cost and investment

Read with this

Other copies of these documents (5)

Earlier drafts

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.