CERC · Central Electricity Regulatory Commission
Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2014 — Third Amendment — Explanatory Memorandum — Draft
Explanatory Memorandum for CERC Draft (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Third Amendment) Regulations, 2014
Explanatory memorandum to a draftReleased with the notice dated 16 Apr 2015
Draft
The draft has since been finalised as the Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015.
Explanatory memorandum to the Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's explanatory memorandum for the draft (Terms and Conditions for Tariff determination from Renewable Energy Sources) (Third Amendment) Regulations, 2014. It explains why the Commission proposes to substitute two norms in the principal RE tariff regulations — Regulation 38 on station heat rate and Regulation 43 on calorific value — for biomass power projects, after allowing fossil fuel use up to 15% of calorific value on an annual basis (p1–4).
The Background section (p1–2) traces the proposal to a CERC suo-motu order of 27 March 2012 on generic levellised RE tariffs, which noted stakeholder concerns about biomass plant viability. CERC constituted a committee on 11 October 2012 to study biomass plant performance and fuel prices; the committee reported on 16 July 2013, finding fuel availability, quality and supply-chain problems. The section also records the Commission's 25 November 2014 second amendment allowing fossil fuel use up to 15% and its direction to staff to examine the impact on station heat rate separately.
The section on impact on station heat rate (p2–3) explains how the earlier norm assumed 100% biomass and sets out a formula to separate fossil-fuel and biomass heat contributions, applying different operating margins to each. It derives revised station heat rates for travelling grate and AFBC boilers and proposes a substituted Regulation 38.
The section on calorific value (p3–4) explains the need to determine a normative GCV for a biomass–fossil fuel combination. It provides a formula for specific fuel consumption, derives the combination GCV for both boiler types, and proposes a substituted Regulation 43.
The memorandum is for stakeholders commenting on the draft amendment; it does not itself amend the regulations, and no commencement or gazette date is stated (p1–4).
Read with this
The regulation
Amendments and corrections
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources (First Amendment) Regulations, 2014
- Dated 5 Jan 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 10 Jul 2015Terms and Conditions for Tariff determination from Renewable Energy Sources (Third Amendment) Regulations, 2015
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment, 2016
Commencement notices and reasons
- Dated 6 Feb 2012RE Tariff Regulations, 2012 — Statement of Objects and Reasons
- Dated 18 Mar 2014RE Tariff Regulations, 2012 — First Amendment, 2014 — Statement of Reasons
- Dated 5 Jan 2015RE Tariff Determination (Second Amendment) Regulations, 2014 — Statement of Reasons
- Dated 10 Jul 2015RE Tariff Third Amendment Regulations, 2015 — Statement of Reasons
- Dated 7 Oct 2015RE Tariff Regulations, 2012 — Fourth Amendment, 2015 — Statement of Reasons
- Dated 30 Mar 2016RE Tariff Regulations, 2012 — Fifth Amendment, 2016 — Statement of Reasons
Other copies of these documents (5)
- Dated 6 Feb 2012RE Tariff Regulations, 2012
- Dated 5 Jan 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014
- Dated 18 Mar 2014Terms and Conditions for Tariff determination from Renewable Energy Sources, 2012 — First Amendment Regulations, 2014
- Dated 7 Oct 2015Renewable Energy Sources Tariff Regulations, 2012 — Fourth Amendment, 2015
- Dated 30 Mar 2016Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fifth Amendment Regulations, 2016
Proposed changes (drafts with no final yet)
- Dated 3 Mar 2015Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 under RE Tariff Regulations, 2012 — Draft
- Dated 3 Mar 2015File: Benchmark Capital Cost Norm for Solar PV and Solar Thermal Projects, FY 2015-16 — Suo-Motu Order — Draft
- Dated 3 Mar 2015Public notice: Generic Levellised Generation Tariff for Renewable Energy Sources, FY 2015-16 — Public Notice
Earlier drafts
- Dated 6 Dec 2013RE Tariff (First Amendment) Regulations, 2013 — Draft
- Dated 6 Dec 2013Public notice: Renewable Energy Sources Tariff (First Amendment) Regulations, 2013 — Draft
- Released with the notice dated 6 Dec 2013Explanatory memorandum: RE Tariff Regulations, 2012 — First Amendment, 2013 — Explanatory Memorandum
- Dated 25 Nov 2014Terms and Conditions for Tariff Determination from Renewable Energy Sources (Second Amendment) Regulations, 2014 — Draft
- Dated 25 Nov 2014Public notice: RE Tariff Determination (Second Amendment) Regulations, 2014 — Public Notice
- Released with the notice dated 25 Nov 2014Explanatory memorandum: RE Tariff (Second Amendment) Regulations, 2014 — Explanatory Memorandum — Draft
- Dated 16 Apr 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources (Third Amendment) Regulations, 2015 — Draft
- Dated 16 Apr 2015Public notice: Draft RE Tariff Determination (Third Amendment) Regulations, 2015 — Public Notice
- Released with the notice dated 10 Aug 2015Terms and Conditions for Tariff Determination from Renewable Energy Sources, 2012 — Fourth Amendment, 2015 — MSW and RDF
- Released with the notice dated 10 Aug 2015Explanatory memorandum: MSW/Waste to Energy Generic Tariff Norms, 2015-16 — Explanatory Memorandum
- Dated 10 Aug 2015Public notice: Public Notice — Proposed Generic Tariff Norms for Municipal Solid Waste/Waste to Energy Projects and Indicative Tariff for 2015-16
- Dated 16 Mar 2016Renewable Energy Tariff Determination (Fifth Amendment) Regulations, 2016 — Draft
- Dated 16 Mar 2016Public notice: Renewable Energy Sources Tariff Regulations, 2012 — Fifth Amendment, 2016 — Public Notice — Draft
- Released with the notice dated 16 Mar 2016Explanatory memorandum: Renewable Energy Sources Tariff, 2012 — Fifth Amendment, 2016 — Explanatory Memorandum — Draft
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.